"[Approved Street Name] - Private". <br />Sheet L2.0 of the final PUD plans have been revised and include the label "Private" at the end <br />of proposed private streets. Therefore, this condition has been met. <br />4. The structural design and construction inspection for the private streets will remain the <br />developer's responsibility. Certification by a licensed engineer that a structural design <br />meeting the applicable standards will be required at the time of the site development <br />permit for the private street. <br />This condition of approval will be further reviewed during the site development permit process. <br />S. Prior to final PUD and plat approval, the applicant shall submit Private Joint Use Access <br />and Utility Easement and Maintenance Agreement (JAM). The JAM will include a <br />description defining the area of the private street and will also identify permitted <br />improvements, construction expectations, rights of usage and maintenance <br />responsibilities for the facilities in the street. The JAM will be recorded concurrent with <br />and cross-referenced on the final plat. <br />A JAM was submitted with the application materials that defines the private street area, <br />identifies permitted improvements, construction expectations, rights of usage and <br />maintenance responsibilities for the facilities in the street. However, Public Works review has <br />found that the Recitals section describes Lot A as only Tambour Lane — Private, however, the <br />JAM will need to be revised and include Tambour Court as part of Lot A. Additionally, in the <br />Permitted Improvements and Construction Expectations section, the creation of a blanket <br />Public Utility Easement (PUE) and a blanket Private Utility Easement in the same area is not <br />allowed. The JAM will need to be revised to either define a blanket PUE with a private utility <br />corridor or a blanket private utility easement with a PUE corridor. <br />Based on the identified issues above and the requirement that the JAM will be recorded <br />concurrent with and cross-referenced on the final plat, the following condition of approval is <br />warranted: <br />10. Prior to final site plan approval, the applicant shall submit a revised Private Joint Use <br />Access and Utility Easement and Maintenance Agreement (JAM) that includes <br />referencing Tambour Lane and Tambour Court as part of Lot A, and the Permitted <br />Improvements and Construction Expectations section shall be revised to either define a <br />blanket PUE with a private utility corridor or a blanket private utility easement with a <br />PUE corridor. <br />Based on the above findings and condition of approval, this condition will be met. <br />6. Provisions for a public emergency access easement within the private street may be <br />March 2026 Findings & Decision of the Planning Director Page 21 of 28 <br />Braewood Hills Third Addition (SDR 25-02 & PDF 25-01) <br />