My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
MHT
>
2026
>
MHT 26-01
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 9:02:59 AM
Creation date
2/12/2026 9:02:28 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
MHT
File Year
26
File Sequence Number
1
Application Name
Pennington & Laing
Document Type
Application Materials
Document_Date
2/11/2026
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Middle Housing Land Division – Replat of P3 of LPPN 2025 – P3284 <br />Metro Planning, Inc February 2026 8 | P a g e <br /> <br />(2) Access Connections to Arterial and Major Collector Streets. In addition to the standards set forth in this EC 7.420(1), <br />access connections to arterial and major collector streets shall be located in accordance with the following standards. <br /> <br />The subject property is not located on an Arterial or Major Collector Street; the criteria contained in Subsection (2) is not applicable. <br /> <br />(3) Access Connections to Local and Neighborhood Collector Streets. In addition to the location standards set forth in EC <br />7.420(1), access connections to local and neighborhood collector streets shall be located in accordance with the following <br />standards: <br />(a) Lots and parcels at intersections shall have the access connection begin no less than 20 feet from the end of <br />the radius of the curb, or 20 feet from the property corner if there is no curb. <br /> <br />The subject property is not located at an intersection; subsection (a) above is not applicable. <br /> <br />(b) A safety island of not less than 22 feet of full height curb shall in all cases be provided between access <br />connections under one ownership. <br /> <br />The Variable Width Shared Access Easement is proposed for use by the new middle housing lots; access connection standards do <br />not apply to a private driveway easement. A safety island is not required for this proposal. <br /> <br /> <br />EC 9.8194 Middle Housing Land Division, Tentative Plan Approval Criteria. <br /> <br />(2) If the property to be divided is developed with middle housing: <br /> <br />(a) The middle housing complies with EC 9.5550; or <br /> <br />(b) The certificate of occupancy for the middle housing was issued before June 30, 2022, and the middle housing <br />complied with applicable land use requirements at the time the certificate of occupancy was issued. <br /> <br />The subject property contains no existing middle housing; this criterion is not applicable. <br /> <br />(3) The proposed middle housing land division complies with all of the following: <br /> <br /> (a) EC 9.2777, Middle Housing Lot standards; <br /> <br />EC 9.2777 is addressed on page 5 of this written narrative. <br /> <br />(b) EC 9.6505, Improvements, Specifications for any street frontage improvements required for middle housing <br /> lots that abut a street; <br /> <br />EC 9.6505 – Improvements – Specifications. <br /> <br />(1) Water Supply. All developments shall be served by the water system of the Eugene Water and Electric Board. <br /> <br />All proposed middle housing lots will be served by EWEB via the existing Joint Use Access & Utility Easements from Horn Lane to <br />the subject property and then via the proposed Variable Width Joint Access & Utility Easement to each new middle housing lot. See <br />the attached Civil Engineering plan for utility details. Exact locations to be finalized at the time of building. <br /> <br />(2) Sewage. All developments shall be served by the wastewater sewage system of the city, complying with provisions in <br />Chapter 6 of this code. Public improvements will be constructed privately. <br /> <br />City of Eugene sanitary sewer lines are existing in Horn Lane and currently serve the existing dwelling at 1010 Horn Lane. All three <br />proposed middle housing lots will be served by individual wastewater lines extending from the existing service; exact locations for <br />wastewater laterals to individual dwelling units will be finalized at the time of building permit.
The URL can be used to link to this page
Your browser does not support the video tag.