<br />OK <br /> <br /> <br />7. Prior to final plat approval, the applicant shall dedicate a 14-foot Public Utility Easement <br />or Public Wastewater Easement that will encumber the proposed public wastewater <br />system. The required easement shall also be shown on revised final PUD plans. <br /> <br />OK <br /> <br />8. The final PUD site plans shall include the following note: “No building, structure, tree or <br />other obstruction shall be placed or located on or in a Public Utility Easement, consistent <br />with EC 9.6500(3)”. <br /> <br />OK <br /> <br />9. The final PUD site plans shall include the following note: “Compliance with public <br />improvement requirements shall be demonstrated in accordance with EC 9.6505 as part <br />of the permitting process for development within the PUD including Privately <br />Engineered Public Improvement (PEPI) Permits, Site Development Permits and Building <br />Permits.” <br /> <br />OK <br /> <br />10. The final PUD site plans shall include the following note: “A Privately Engineered Public <br />Improvement (PEPI) permit shall be issued for the construction of public improvements <br />prior to development.” <br /> <br />OK <br /> <br />11. Prior to final plat approval, the applicant shall provide documentation that EWEB has <br />received a financial guarantee, ensuring water will be provided to each lot in the plat. <br /> <br />OK <br /> <br />12. Prior to final PUD approval, the applicant shall submit an updated site plan that depicts <br />wastewater service to Lot 38. <br /> <br />The final Site Plan shall show Lots 37 and 38 combined. <br /> <br />Modify. <br />Verify applicant commitment to combined Lots 37 and 38. <br /> <br />Appeal Testimony (PDT 24-01 & ST 24-03) - Batch #1 Page 21 of 43