My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appeal Testimony Received 10-13-2024 thru 1pm on 01-14-2025
>
OnTrack
>
PDT
>
2024
>
PDT 24-1
>
Appeal Testimony Received 10-13-2024 thru 1pm on 01-14-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2025 12:51:01 PM
Creation date
1/16/2025 12:50:35 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
24
File Sequence Number
1
Application Name
BRAEWOOD HILLS 3RD ADDITION
Document Type
Appeal Public Comments Prior to Hearing
Document_Date
1/14/2025
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Applicant’s 1/13/2025 Annotations to <br /> <br />Braewood Hills 3rd Addition (PDT 24-1 and ST 24-3) <br />Complete/Revised List of Proposed Conditions of Approval <br /> <br />Applicant’s recommended changes and rationale are in red. <br /> <br />1. On the final PUD site plans and final plat, the applicant shall create an access restriction <br />strip along the westerly boundary line of Lot 15 abutting Hawkins Lane. <br /> <br />OK <br /> <br />2. Prior to final plat approval, the applicant shall demonstrate approval from the regional <br />road naming group for alternate street names to replace “Stonehedge Way” and <br />“Stonehedge Court”. <br /> <br />OK <br /> <br />3. The private streets shall be labeled on the final plat and final PUD site plans as <br />“[Approved Street Name] - Private”. <br /> <br />OK <br /> <br />4. The structural design and construction inspection for the private streets will remain the <br />developer’s responsibility. Certification by a licensed engineer that a structural design <br />meeting the applicable standards will be required at the time of the site development <br />permit for the private street. <br /> <br />OK <br /> <br />5. Prior to final PUD and plat approval, the applicant shall submit Private Joint Use Access <br />and Utility Easement and Maintenance Agreement (JAM). The JAM will include a <br />description defining the area of the private street and will also identify permitted <br />improvements, construction expectations, rights of usage and maintenance <br />responsibilities for the facilities in the street. The JAM will be recorded concurrent with <br />and cross-referenced on the final plat. <br /> <br />OK <br /> <br />6. Provisions for a public emergency access easement within the private street may be <br />included in the proposed JAM which creates the private street, or alternatively may be <br />dedicated as a Public Emergency Access Easement on a standard City form. <br />Appeal Testimony (PDT 24-01 & ST 24-03) - Batch #1 Page 20 of 43
The URL can be used to link to this page
Your browser does not support the video tag.