My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Testimony (Open Record 1 to 10-3-18)
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Public Testimony (Open Record 1 to 10-3-18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:38:36 AM
Creation date
10/4/2018 7:58:12 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Public Testimony
Document_Date
10/3/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Length 2014 Cost <br />Name/Location Extent <br />No. (miles) Estimate <br />Coburg Road <br /> <br />Improve frequent transit service and Eugene Station to I-Included in transit/multimodal <br />MM-6 <br />multimodal travel along Coburg Road and 5/Crescent Avenue corridor bundle <br />transit connections to Springfield <br />Martin Luther King Jr. Boulevard <br /> <br />Improve frequent transit service and Coburg Road to I-5 Included in transit/multimodal <br />multimodal travel along Martin Luther King corridor bundle <br />MM-7 <br />Jr. Boulevard to Centennial Boulevard in <br />Springfield <br />Add center turn lane on Martin Luther King Leo Harris Parkway 0.21 $6.7M <br />Jr. Boulevard West and <br />MM-8 <br />Centennial Loop <br />West <br />West Eugene EmX <br /> <br />West Eugene EmX extension along W 6th, Commerce Street to Funded; under construction <br />7th, and 11th Avenues, Garfield and Eugene Station <br />MM-9 <br />Charnelton Streets (project is currently <br />funded and under construction) <br />30th Avenue/Amazon Parkway <br /> <br />Achieve frequent transit service and Downtown to Lane Included in transit/multimodal <br />improved multimodal travel along the 30th Community College corridor bundle <br />Avenue and Amazon Parkway corridor; <br />MM-10 <br />enhance pedestrian crossings and provide <br />protected bikeways in the corridor (note: only <br />the portion of the project within Eugene's <br />UGB is included in the TSP) <br />Complete Street Upgrades of Existing Streets <br /> <br />Upgrade Hunsaker Lane/Beaver Street <br />River Road to <br />MM-11 <br />consistent with major collector/urban 1.1 $9.3M <br />Division Avenue <br />collector standards <br />Wildish <br />Upgrade the north/south section of County <br />Lane/County Farm <br />MM-12 <br />0.7 $4.4M <br />Farm Road consistent with major collector <br />Road to Coburg <br />standards <br />Road <br />Highway 99 to <br />Upgrade Bethel Drive consistent with <br />MM-13 <br />Roosevelt 1.7 11.8M <br />neighborhood collector standards <br />Boulevard <br />Upgrade W 11th Avenue consistent with Terry Street to <br />MM-14 <br />1 $12.3M <br />major arterial standards Green Hill Road <br />Upgrade Jeppesen Acres Road consistent <br />Gilham Road to <br />MM-15 <br />with its designation as a bike boulevard and 0.7 $3.9M <br />Providence Street <br />neighborhood collector <br />Upgrade Bertelsen Road consistent with 18th Avenue to <br />MM-16 <br />0.57 $3.9M <br />minor arterial standards. Bailey Hill Road <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.