Table 5.1: Roadway, Multimodal, Transit, and Rail Projects to be Completed Within <br />10 <br />20 Years <br /> <br />Project Length 2014 Cost <br />Name/Location Extent <br />No. (miles) Estimate <br />River Road <br /> <br />Improve frequent transit service and Hunsaker Lane to Included in transit/multimodal <br />MM-1 <br />11 <br />multimodal travel along River Road West 11th Avenue <br />corridor bundle <br />Future Santa Clara Community Transit River Road and Included in transit/multimodal <br />Center: new transfer station at River Road Hunsaker Lane corridor bundle <br />MM-2 <br />and Hunsaker Lane to facilitate bus <br />transfers, park and ride, bike parking <br />Randy PapŽ Beltline Highway Facility Plan Recommendations <br />Construct multimodal local arterial bridge River Road to 0.95 $83M <br />over the Willamette River to the north of the Coburg Road <br />Beltline Highway, connecting Division <br />Avenue to Green Acres Road; construct <br />MM-3 <br />operational improvements to existing Randy <br />PapŽ Beltline Highway/Delta Highway ramps <br />consistent with the Beltline Highway Facility <br />Plan <br />I-5/Beltline <br /> <br />12 <br />Improve I-5/Randy PapŽ Beltline Highway I-5/Randy PapŽ <br />Funded and under construction <br />MM-4 <br />interchange (project is currently funded and Beltline Highway <br />underway) interchange <br />Highway 99 <br /> <br />Improve frequent transit service and Downtown to Barger Included in transit/multimodal <br />MM-5 <br />multimodal travel along Highway 99 Drive corridor bundle <br />10 <br />11 <br />12 <br /> <br />