My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Testimony (Open Record 1 to 10-3-18)
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Public Testimony (Open Record 1 to 10-3-18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:38:36 AM
Creation date
10/4/2018 7:58:12 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Public Testimony
Document_Date
10/3/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Length 2014 Cost <br />Name/Location Extent <br />No. (miles) Estimate <br />Other Projects <br /> <br />Reconstruct Franklin Boulevard pursuant to <br />the Walnut Station Plan (for purposes of cost <br />estimating a multiway boulevard design from <br />Walnut Street to <br />MM-19 <br />0.6 $27.7M <br />this plan was used); make streetscape <br />Onyx Street <br />improvements including new sidewalks on <br />the south side and a shared use path on the <br />north side between Onyx and Alder Streets <br />Add lanes on the Randy Pap Beltline <br />Highway and provide intersection <br />Roosevelt <br />improvements at the Randy Pap Beltline <br />MM-20 <br />Boulevard to W 11th 1.1 $28.1M <br />Highway/W 11th Avenue and Randy Pap <br />Avenue <br />Beltline Highway/Roosevelt Boulevard <br />intersections <br />West of Primrose <br />Street to where the <br />street widens to two <br />Widen Barger Drive to provide a second <br />MM-21 <br />lanes in each 0.14 $1.9M <br />through lane in each direction <br />direction west of <br />Randy Pap Beltline <br />Highway <br />High Street to <br />MM-22 <br />Convert 8th Avenue to two-way street 0.7 $3.9M <br />Jefferson Street <br />Neighborhood traffic calming to address <br />MM-26 <br />Various locations N/A $2.0M <br />speeding problems on residential streets <br />including collector streets <br />Upgrade North Gilham Road consistent with Ayres Road to <br />MM-27 <br />0.3 $1.5M <br />neighborhood collector standards Ashbury Drive <br />Extend Shadowview to Coburg Road (or <br />Shadowview Road <br />beyond to Park View Drive) via Spectrum <br />to Coburg Road <br />MM-28 <br />Avenue to serve future development 0.3 $3.2M <br />(may extend to Park <br />consistent with neighborhood collector <br />View Drive) <br />standards <br />Rail Improvements <br /> <br />Improve passenger platform and construct <br />new rail sidings to enhance passenger rail <br />MM-23 Eugene Depot N/A $20.3M <br />service and separate passenger rail from <br />freight rail at the Eugene Depot <br />Downtown and <br />Establish Railroad Quiet Zone; assumes 10 <br />MM-24 <br />Whiteaker N/A $5M <br />crossings <br />neighborhoods <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.