Capital Hill PUD Page 50 of 67 <br />Planned Unit Development Application - Tentative Stage - Written Statement <br />March 3, 2017 Revised:June 19, 2017 <br />Lot 12 77+ feet on Cupola Drive <br />Lot 13 80+ feet on Cupola Drive <br />Lot 14 66+ feet on Cupola Drive <br />Lot 15 32+ feet on Cupola Drive (requesting flexibility through PUD purpose statement) <br />Lot 16 No frontage (requesting flexibility through PUD purpose statement) <br />Lot 17 No frontage (requesting flexibility through PUD purpose statement) <br />Lot 18 No frontage (requesting flexibility through PUD purpose statement) <br />Lot 19 110+ feet on Cupola Drive <br />Lot 20 200+ feet on Cupola Drive <br />Lot 21 125+ feet on Cupola Drive <br />Lot 22 200+ feet on Capital Drive <br />Lot 23 140+ feet on Capital Drive <br />Lot 24 80+ feet on Capital Drive <br />Lot 25 55+ feet on Capital Drive <br />Lot 26 120+ Feet on Cupola Drive <br />Lot 27 160+ feet on Cupola Drive <br />Lot 28 95+ feet on Cupola Drive <br />Lot 29 95+ feet on Cupola Drive <br />Lot 30 82+ feet on Cupola Drive <br />Lot 31 125+ feet on Cupola Drive <br />Lot 32 90+ feet on Cupola Drive <br />(b) EC 9.6500 through EC 9.6505 Public Improvement Standards. <br />EC 9.6500 Easements. <br />(1) The city may require the dedication of easements for wastewater sewers and other public <br />utilities, and for access thereto for maintenance, of a sufficient width to meet the intended use, <br />provided the city makes findings to demonstrate consistency with constitutional requirements. <br />See Site Plan for location of proposed utility easements. <br />(2) Easements may be required along lot or parcel rear lines or side lines, or elsewhere as <br />necessary to provide needed facilities for present or future development of the area. <br />See Site Plan for location of proposed utility easements. <br />(3) No building, structure, tree, or other obstruction shall be placed or located on or in a public utility <br />easement. Prior to approval of a final PUD, final site review plans, or final plats, there shall <br />appear thereon a restriction showing compliance with this subsection. <br />Acknowledged and agreed. <br />EC 9.6505 Improvements - Specifications. All public improvements shall be designed and <br />constructed in accordance with adopted plans and policies, the procedures specified in Chapter 7 <br />of this code, and standards and specifications adopted pursuant to Chapter 7 of this <br />code. Additionally, all developments shall make and be served by the following infrastructure <br />improvements: <br />(1) Water Supply. All developments shall be served by the water system of the Eugene Water & <br />Electric Board. <br />See Sheet C1: Wastewater and Water Plan. <br />(2) Sewage. All developments shall be served by the wastewater sewage system of the city, <br />complying with provisions in Chapter 6 of this code. Public improvements will be constructed <br />privately. <br />See Sheet C1: Wastewater and Water Plan. <br />Schirmer Satre Group • 375 West 4 m Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 <br />