Expected to Provide the Appropriate Site Characteristics for the <br />Proposed Use <br />City of Eugene Urban Growth Boundary Study <br />iffi-.c+. Industrial Land Evaluation <br />Subarea. P4.9: Site Characteristics of Unconstrained Land <br />IRWAW <br />wj< <br />i <br />L <br />Current UGB <br />A <br />i <br />Y,. <br />Subarea Boundary <br />Current Eugene UGS <br />Taxlots <br />Ci Street Rights Of Way <br />Major Streets <br />- Designated Freight Route <br />Streets within a Mile of Freight Route Access <br />C; Constrained Land <br />Displayed Site Characteristics of Unconstrained Land <br />Sites More than 1 Mile from Freight Route^ T <br />Sites of Insufficient Scze wdhln 1 Mile of Freight Route <br />Fourth Priority Land for Further Consideration (None) Eugene <br />Appendix B to Findings May 2017 Page 122 <br />