lot industrial properties would fail to meet the City's economic development needs, resulting in <br />either the same number of jobs or a net loss, depending on employment density. <br />Summary of Development Constraints <br />In all, 241.3 acres of the land in Subarea P2.1 have one or more development constraints <br />("factors that temporarily or permanently limit or prevent the use of land for economic <br />development" per OAR 660-009-005(2)). The remaining 31.5 acres of land in Subarea P2.1 are <br />addressed below. <br />(b) Dismiss Remaining Candidate Land that Cannot Reasonably <br />Accommodate the Specific Types of Land Needs / Cannot be <br />Expected to Provide the Appropriate Site Characteristics for the <br />Proposed Use <br />uity or tugene Liman [arowtn tsounoary btuay <br />Industrial Land Evaluation <br />Subarea P2.1. Site Characteristics of Unconstrained Land <br />Current UG8 +r' <br />1'. <br />1 <br />t <br />1 <br />~ 30°y Avenue <br />, <br />:t <br />t, <br />, <br />t <br />t <br />~I-5 <br />t <br />, <br />i <br />I <br />- S.oare;~ 8?u,n".eryorsgiayed. S+tc Characte ristres of uneanstratned La„d <br />Curren[ Eugene UG8 - 5^es x!r.re :nary , mile from FreHjnt Route <br />Taxiots or insutr~ofli s:2e wahin 1 Mile of Freight Ravte <br />Street Frgnts of Way Pnorq Land tar FuMor Censideravon (None) <br />Eugene <br />Maier streets <br />Ocsignateo Freight Roure <br />5tree7s w thin a MGM nt Frn+ght Route Access <br />- <br />Constrained Land <br />Appendix B to Findings May 2017 Page 21 <br />