Figure 2. Employment Land Supply (2012-2032) <br />Map the 1 of 18 <br />Awbrey Lin <br />\ <br />Clear Lake <br />UGB <br />y <br />Expansion <br />Area <br />-E-Enid-Rd <br />Urban Growth Boundary D 2012 BLI Taxlots - <br />Major Streets <br />0 0.25 <br />Miles <br />0.5 N <br />- - - UGB Expansion Boundary Water Bodies <br />Rail Road May 2017 <br />Plan Designations -Vacant Employments Lands <br />Caution: This map is subject to change and for use within the scope of <br />the May 2017 Review. This map is not <br />suitable for legal, engineering, or <br />Commercial KN Special Heavy Industrial <br />y <br />Government & Education Datta a So SUfV Souurrcesces: : City <br />City <br />- of Eugene, RLI D. <br />® Major Retail Center Light Medium Industrial <br />- The land supply was conducted at a sub-tax lot level analysis; tax lot <br />Parks and Open Space boundaries are shown for reference only and may change over time. <br />Commercial Mixed Use 21i Campus Industrial <br />- For assumed capacity of land shown <br />Parks/Open Space Mixed Use Part VI. <br />on the land supply, see Table 5 of <br />Heavy Industrial University Research <br />N Mixed Use <br />Partially Vacant (PV) or Redevelopment Employment Lands ® Industrial (IND) vacant - 10 acres <br />s <br />7 a <br />Industrial (IND) Partially Vacant/ Redevelopment <br />Employment (E) Zone <br />910 11 12 <br />0 Commercial (COM) Partially Vacant <br />Developed Commercial & Industrial Lands <br />1a is 1 <br />Committed or Protected Lands (in UGB) <br />18 <br />