Figure 1. Employment Land Supply (2012-2032) <br />and UGB Expansion <br />r--- <br />1 1 <br />r- Santa Clara <br />Cl <br />L <br />k <br />ear <br />a <br />e <br />l~ II ~_.rl Recommended <br />Recommended <br />UGB Expansion <br />UGB Expansion !ottJi f~ <br />J ; <br />WILKES DR <br />i <br />1 f-' %------1 1 i <br />' _ a <br />1 <br />~ <br />R.P. BELTLINE RD ~ L <br />~ <br />y <br />z ~ <br />~ BARGER DR <br />1 pw 1 <br />ti411 <br />c <br />1 ROYAL AVE <br />O 1 <br />1 SSy2,9 v <br />v ■ <br />y <br />1 j <br />d b 1 <br />1 -ILI <br />1 1 <br />' <br />I. xx~ IP 1 . <br />XX 1 <br />W 11THAVE <br />1 W 18TH AVE <br />1 <br />~ <br />` <br />U) <br />_ LU 03 <br />% <br />r ~ <br />1 ~ <br />1 1 <br />N <br />1 I Miles <br />0 1 2 <br />Lo May 2017 <br />Urban Growth Boundary (2012) Water Bodies Roads <br />Plan Designation - Vacant Employment Lands <br />Commercial Heavy Industrial S?S Campus Industrial Parks and Open Space <br />o Major Retail Center ;x Special Heavy Industrial ; University Research Parks/Open Space Mixed Use <br />,.,N Commercial Mixed Use Light Medium Industrial Government & Education .X Mixed Use <br />Partially Vacant (PV) or Redevelopment Employment Lands Industrial (I ND) Vacant - 10 acres <br />Caution: This map is subject to change and for used within the scope <br />Industrial (IND) Partially Vacant (PV) / Redevelopment Employment (E) Zone of the May 2017 Review. This map is not suitable for legal, <br />=Commercial (COM) Partially Vacant (PV) engineering, orsurveying purposes. <br />The location of the UGB line on these maps is imprecise; for the <br />precise location see the Figure 2 2032 Residential Land Supply maps. <br />