Figure 2. Employment Land Supply (2012-2032) <br />Mao tile 2 of 18 <br />Beacon Dr <br />n <br />m Urban Growth Boundary 0 2012 BLI Taxlots - Major Streets <br />- - - UGB Expansion Boundary Water Bodies Rail Road <br />A= <br />Miles <br />0 0.25 0.5 N <br />May 2017 <br />Plan Designations -Vacant Employments Lands - caution: This map is subject to change and for use within the scope of <br />the May 2017 Review. This map is not suitable for legal, engineering, or <br />cesces: : City <br />Commercial KN Special Heavy Industrial Government & Education Data Surveyi Song urrpurposes. <br />City <br />y - of Eugene, RLI D. <br />- The land supply was conducted at a sub-tax lot level analysis; tax lot <br />® Major Retail Center Light Medium Industrial Parks and Open Space boundaries are shown for reference only and may change over time. <br />- For assumed capacity of land shown on the land supply, see Table 5 of <br />N` Commercial Mixed Use 21~ Campus Industrial N` Parks/Open Space Mixed Use Part VI. <br />Heavy Industrial University Research N Mixed Use <br />Partially Vacant (PV) or Redevelopment Employment Lands IZJ Industrial (IND) vacant - 10 acres s <br />7 a <br />Industrial (IND) Partially Vacant/ Redevelopment Employment (E) Zone 910 11 12 <br />0 Commercial (COM) Partially Vacant Developed Commercial & Industrial Lands la 15 1 <br />Committed or Protected Lands (in UGB) <br />