Eugene Ordinance Exhibit J <br />[Lane County Ordinance Exhibit G] <br />-Storage system <br />-Pumping system <br />-Primary distribution system <br />PFSP includes proposed <br />transmission lines 24" or <br />larger, reservoirs, pump <br />stations and sources of <br />water. <br />• Construct new Hawkins View 1150 Pump Station ($953,000) <br />• Replace the existing Crest 1150 Pump Station ($982,000) <br />• Construct new Santa Clara Pump Station and 5 MG Reservoir at <br />the existing Santa Clara Pump Station and Reservoir site <br />($12,442,000) <br />• Construct new 5 MG College Hill Reservoir and decommission <br />existing 15 MG College Hill Reservoir. ($9,370,000) <br />• Construct 10,000 feet of 36-inch pipeline in 23rd Avenue and <br />Alder Street ($8 971 000) <br />. Construct 5 MG Elliott Reservoir ($9,370,000) <br />. Construct 5 MG Reservoir at either the Santa Clara site, Elliott <br />site, or Oakhill Reservoir Site (off Cantrall Rd) ($9,370,000) <br />Wastewater <br />Bailey Hill/Gimpl Hill <br />Per OAR 660-011-0005(7)(b), <br />• 0.8 MGD Pump Station ($800,000) <br />public wastewater facility <br />To be located in vicinity of intersection of Gimpl Hill Road/Gimp) <br />systems are limited to: <br />Way on yet to be identified property (approximately 600 square <br />feet). <br />-Treatment facility system <br />North Delta Highway (River Ridge) <br />-Primary collection system <br />• 0.3 MGD Pump Station ($600,000) <br />To be located around the northwest corner of the River Ridge golf <br />course on yet to be identified property (approximately 600 square <br />Note: PFSP includes <br />feet). <br />proposed lines that 24" or <br />larger, and local or regional <br />North Coburg Road <br />pump stations <br />• 0.3 MGD Pump Station ($600,000) <br />To be located north of Coburg Road, on yet to be identified property <br />(approximately 600 square feet). <br />Stormwater <br />• None. 14 <br />Per OAR 660-011-0005(7)(c), <br />public stormwater facility <br />systems are limited to: <br />-Major drainageways <br />-Outfall locations <br />14 Following the update of the city's the stormwater basin plans, additional projects called for in those plans will be <br />added to the PFSP. <br />35 <br />May 2017 <br />