My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Employment, Parks, Schools Ordinance (City)- Planning Commission Recommendation (3 of 4)
>
OnTrack
>
CA
>
2017
>
CA 17-1
>
Employment, Parks, Schools Ordinance (City)- Planning Commission Recommendation (3 of 4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2017 1:48:03 PM
Creation date
5/16/2017 2:41:17 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
17
File Sequence Number
1
Application Name
UGB ADOPTION PACKAGE
Document Type
Misc.
Document_Date
5/16/2017
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eugene Ordinance Exhibit J <br />[Lane County Ordinance Exhibit G] <br />Note: PFSP includes <br />proposed drainage/channel <br />improvements and/or piping <br />systems 36" or larger, <br />detention ponds, outfalls and <br />water quality projects <br />To comply with the applicable provisions of state, the above identified projects, rough cost estimates <br />and timing necessary to serve the UGB expansion areas and other areas in the City's current UGB must <br />be adopted into the PFSP. To that end, the following tables and maps from the PFSP are amended as <br />part of this action: <br />• Table 1 EWEB Water System Improvements Projects (projects 111-117, 223, 226, 238-242) <br />• Table 3 City of Eugene Wastewater System Improvement Projects (projects 100, 202-204) <br />• Table 5 City of Eugene Stormwater System Improvement Projects (projects 59-63) <br />• Table 13 EWEB Water System Improvements, Estimated Costs, and Timing (projects 111- <br />117, 223, 226, 238-242) <br />• Table 15 City of Eugene Wastewater System Improvements, Estimated Costs, and Timing <br />(projects 100, 202, 204) <br />• Table 17 City of Eugene Stormwater System Improvements, Estimated Costs, and Timing <br />(projects 59-63) <br />• Map 1 Planned Water Facilities <br />• Map 2 Planned Wastewater Facilities <br />• Map 3 Planned Stormwater Facilities <br />• Map 8 Public Service Availability in Eugene-Springfield Metropolitan Area <br />The amendments to these tables and maps from the PFSP are provided as Exhibits C-1 and C-2 to the <br />City's adoption ordinance. Regarding these amendments, the relevant Oregon Administrative Rules and <br />findings addressing each are provided below. <br />OAR 660-011-0010 The Public Facility Plan <br />(1) The public facility plan shall contain the following items: <br />(a) An inventory and general assessment of the condition of all the significant public facility <br />systems which support the land uses designated in the acknowledged comprehensive plan; <br />(b) A list of the significant public facility projects which are to support the land uses designated in <br />the acknowledged comprehensive plan. Public facility project descriptions or specifications of <br />these projects as necessary; <br />(c) Rough cost estimates of each public facility project; <br />(d) A map or written description of each public facility project's general location or service area; <br />(e) Policy statement(s) or urban growth management agreement identifying the provider of each <br />public facility system. If there is more than one provider with the authority to provide the <br />36 <br />May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.