My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Employment, Parks, Schools Ordinance (City)- Planning Commission Recommendation (3 of 4)
>
OnTrack
>
CA
>
2017
>
CA 17-1
>
Employment, Parks, Schools Ordinance (City)- Planning Commission Recommendation (3 of 4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2017 1:48:03 PM
Creation date
5/16/2017 2:41:17 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
17
File Sequence Number
1
Application Name
UGB ADOPTION PACKAGE
Document Type
Misc.
Document_Date
5/16/2017
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eugene Ordinance Exhibit J <br />[Lane County Ordinance Exhibit G] <br />Stormwater <br />Awbrey Lane at Highway 99 <br />• Culvert upgrade and enhance <br />channel capacity ($390,000) <br />None. <br />Per OAR 660-011-0005(7)(c), <br />public stormwater facility <br />systems are limited to: <br />-Major drainageways <br />-Outfall locations <br />Note: PFSP includes <br />proposed drainage/channel <br />improvements and/or piping <br />systems 36" or larger, <br />detention ponds, outfalls and <br />water quality projects <br />Green Hill Road/ North of Old Airport <br />Road <br />• Channel and culvert improvements <br />($1,625,000) <br />Green Hill Road to Awbrey Lane <br />• Channel and culvert improvements <br />($880,000) <br />Clear Lake Road <br />• Channel and culvert improvements <br />($640,000) <br />West of Terry Street <br />• New open channel, including <br />possible acquisition ($400,000) <br />In addition to the above projects needed to serve the UGB expansion areas, the City and EWEB have <br />identified several additional projects needed to ensure that certain areas within the current UGB can <br />also be provided with sewer and water to accommodate growth expected inside the UGB. <br />PFSP Projects Necessary to Serve Areas within Current UGB <br />PFSP Projects for Areas inside Current UGB <br />Water <br />• Hawkins Hill Reservoir Seismic Upgrades - Reservoir will be <br />divided in half and seismic upgrades to bring the Reservoir up <br />Per OAR 660-011-0005(7)(a), <br />to current code ($1,927,000) <br />public water facility systems <br />• Replace the existing 1.25 MG Willamette 800 Reservoir <br />are limited to: <br />($1,500,000) <br />• Construct a new Shasta 1150 Constant Run Pump Station in <br />-Sources of water <br />lieu of a new reservoir ($500,000) <br />• Construct a new Willamette 975 Pump Station ($857,000) <br />-Treatment system <br />• Construct a new Crenshaw 800 Pump Station - Adds fire flow <br />and domestic service for the Gillespie Butte Area ($925,000) <br />34 <br />May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.