Eugene Ordinance Exhibit J <br />[Lane County Ordinance Exhibit G] <br />PFSP Protects Necessary to Serve UGB Expansion Areas <br />PFSP Projects for Clear Lake Expansion <br />Area (Employment, Park and School <br />Site) <br />PFSP Projects for Santa <br />Clara Expansion Area <br />(Park Site) <br />Water <br />None. <br />None. <br />Per OAR 660-011-0005(7)(a), <br />public water facility systems <br />are limited to: <br />-Sources of water <br />-Treatment system <br />-Storage system <br />-Pumping system <br />-Primary distribution system <br />PFSP includes proposed <br />transmission lines 24" or <br />larger, reservoirs, pump <br />stations and sources of <br />water. <br />Wastewater <br />Enid Road <br />None. <br />Per OAR 660-011-0005(7)(b), <br />• 6.1 MGD Pump Station ($2.8 M) <br />public wastewater facility <br />• 24" Gravity Line ($1.2 M) <br />systems are limited to: <br />-Treatment facility system <br />Pump station to be located in Enid Road <br />area, on yet to be identified property <br />-Primary collection system <br />(approximately 22,000 square feet). <br />Does not include property acquisition. <br />Includes removal of the existing Enid <br />Note: PFSP includes <br />Road pump station. <br />proposed lines that 24" or <br />larger, and local or regional <br />pump stations <br />33 <br />May 2017 <br />