My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPLICATION MATERIALS
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
APPLICATION MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 4:04:22 PM
Creation date
3/7/2017 10:01:45 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Application Materials
Document_Date
3/3/2017
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Hill PUD Traffic Safety Analysis (14-020) <br />March 3, 2017 <br />De Ruta Street and Alta Vista Court that will provide access for two new parcels created with the <br />proposal (lots 19 and 20). A site plan is provided as Appendix E. <br />3.2 Development Level Traffic Volumes and Impacts <br />Based on available national average trip generation rates published by the Institute of <br />Transportation Engineers (ITE) in the Trip Generation Manual, 9" Edition, peak hour trip <br />generation of the entire development site (existing + proposed), with a total of 31 single family <br />detached dwelling units and 12 multi-family apartments, would create a demand of up to 29 AM <br />peak hour trips and up to 38 PM peak hour trips, which would equate to about one new car every <br />two minutes during the peak hours. Since the development does not result in greater than 100 <br />peak hour trips during any one peak hour period, the proposal does not require a traffic impact <br />analysis based on the TIA applicability of City of Eugene Code (EC) 9.8670 which looks at the <br />entire site's highest peak hour trip generation potential. <br />To approximate new daily traffic resulting from proposed development, a reference was made to <br />tube count data collected near Cresta De Ruta Street that indicated the average daily trip <br />generation per occupied dwelling unit is approximately 4.53 trips/unit/day, calculated from an <br />average of 59 daily trips counted and 13 existing dwelling units occupied from Cresta De Ruta <br />Street to the end of Capital Drive (including multi-family and single family residences). The <br />counted trip generation rate is lower than the daily rate provided by the Institute of <br />Transportation Engineers (ITE) trip generation derived rate data likely due to the study area's <br />geographic location and separation distance to retail developments and other attractors that <br />would increase the average daily trip generation potential. <br />Applying the calculated rate of 4.53 trips/dwelling unit/day to the site's potential 37 new <br />dwelling units, the site's contribution to daily traffic would be 168 new vehicle trips. Assuming <br />two existing residences that appear to be currently unoccupied on Capital Drive north of Cresta <br />De Ruta Street are occupied at build-out, their contribution to the daily trip generation would be <br />nine (9) daily trips, and the total ADT of Capital Drive would be 236 average daily trips north of <br />Cresta De Ruta Street, accounting for existing traffic, occupancy at currently unoccupied <br />residences, and build-out of the site. The addition of the new trips will not change the functional <br />classification or traffic character of Capital Drive. <br />3.3 Pedestrian and Motor Vehicle Accommodations <br />Projected motor vehicle traffic volumes on Capital Drive from Spring Blvd to Cresta De Ruta <br />Street are consistent with a low volume residential street, per Eugene Local Street Plan (August <br />1996), which indicates the low-volume residential street design criteria for a new street to serve <br />an average daily traffic volume of between 250 and 750 ADT would include a 45-foot right-of- <br />way width constructed with 21 feet of paving to accommodate two 7-foot travel lanes and one 7- <br />foot parking aisle. Low-volume residential street construction is also identified in the plan to <br />provide two six-foot-wide setback sidewalks with a 6'6" planting strip between the curb and the <br />sidewalk. <br />As described previously, an existing curbside sidewalk with approximately two feet of width is <br />currently constructed on Capital Drive from Spring Boulevard to Alta Vista Court. Topographical <br />constraints exist on Capital Drive that prohibit the feasibility of widening the existing roadway to <br />increase the paving width and/or to accommodate ADA compliant sidewalk construction to meet <br />the local street standard criteria that would be applicable to new construction on this section of <br />© Branch Engineering, Inc. <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.