My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Referral Comments
>
OnTrack
>
PDT
>
2015
>
PDT 15-1
>
Referral Comments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 4:01:54 PM
Creation date
11/9/2015 3:42:19 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
15
File Sequence Number
1
Application Name
CHAMOTEE TRAILS
Document Type
Referral Comments
Document_Date
11/9/2015
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction of curb, sidewalk and storm system would be evaluated and constructed under the <br />Privately Engineered Public Improvement (PEPI) process. <br />Construction of additional paving to meet the 20-foot-width minimum under the Temporary <br />Surface Permit process, in addition to an Irrevocable Petition for future improvements to West <br />Amazon Drive, is also an acceptable option. <br />Irrevocable petitions enable the City to initiate a local improvement process and obligate the <br />property owners to pay their proportional share of the street construction costs in the future. <br />Based on the above findings, conditions, and future permit requirements, the development will <br />comply with these standards. <br />At the time of the subsequent subdivision review, the applicant shall be responsible for completing <br />improvements in West Amazon Drive, by completing half-street improvements through the PEPI <br />process, or by indicating that additional paving which will result in a minimum 20-foot surface will <br />be constructed through a Temporary Surfacing Permit, in which case an Irrevocable Petition for <br />future improvements will be required. <br />The applicant has requested an adjustment of EC 9.6505(3)(b) for the paving requirement of Vivian <br />Drive, citing that Lots 7 -10 will not take access to Vivian Drive, and therefore Vivian Drive will not be <br />impacted by the development. As a condition of Adjustment Review approval, the following condition <br />is warranted: <br />Prior to final PUD approval, the Final PUD plan shall be revised to show that access to the lots <br />fronting on Vivian Drive is not permitted. <br />5) Bicycle Paths and Accessways <br />No bicycle paths or public access ways are required per the previous findings at EC 9.6835, which <br />are incorporated by reference. <br />(7)(c) The PUD complies with Special Flood Hazard Area development standards (EC 9.6705 <br />through EC 9.6709) <br />This standard does not apply as the site is not located within a Special Flood Hazard Area per Flood <br />Insurance Rate Map 41039C-1627-F. <br />(7)(d) The PUD complies with Geological and Geotechnical Analysis (EC 9.6710(6)) <br />The applicant has stated this standard does not apply due to the exemption listed in EC 9.6710(3)(f), that <br />the property is included on the City's acknowledged Goal 5 inventory. While not required with the PUD <br />application, Public Works staff offer the following informational item: <br />PDT 15-01 Chamotee Trails PUD Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.