• A geotechnical analysis will be required as part of the Privately Engineered Public Improvement <br />(PEPI) process for public wastewater improvements. <br />(7)(f) The PUD complies with Public Access (EC 9.6735) <br />EC 9.6735 Public Access Required. <br />(1) Except as otherwise provided in this land use code, no building or structure <br />shall be erected or altered except on a lot fronting or abutting on a public street or <br />having access to a public street over a private street or easement of record <br />approved in accordance with provisions contained in this land use code. <br />The development site has frontage along West Amazon Drive and Vivian Drive right-of-way. All lots <br />will be restricted to access West Amazon Drive, either directly or via a private easement. The <br />proposed PUD complies with this criterion. <br />(2) Access from a public street to a development site shall be located in accordance <br />with EC 7.420 Access Connections - Location. If a development will increase the <br />development site's peak hour trip generation by less than 50% and will generate <br />less than 20 additional peak hour trips, the development site's existing access <br />connections are exempt from this standard. <br />The proposed development site is subject to this standard. The shared access for lots 4 -10 meets <br />the standards at EC 7.420 - Access Connections - Location. Access for lots 1- 3 will be further <br />evaluated during the building permit process. <br />(3) The standard at (2) may be adjusted if consistent with the criteria of EC <br />9.030(28). <br />Based on the foregoing findings, the development complies with these standards and no <br />adjustment is necessary. <br />(7)(g) The PUD complies with Special Setback Standards (EC 9.6750) <br />As discussed previously at EC 9.6805 and EC 9.6870, which is incorporated herein by reference, <br />adjacent streets comply with applicable right-of-way width requirements. No special setbacks are <br />required for future right-of-way or public utility easements. <br />(7)(i) The PUD complies with Vision Clearance Area (EC 9.6780) <br />No encroachments within a regulatory Vision Clearance Area are shown. Should Vivian Drive be <br />improved in the future, Lot 7 will be subject to these standards, and analysis of potential Vision <br />Clearance Area encroachments would be evaluated at the time of building permit. <br />(7)(j) The PUD complies with Stormwater Development Standards (EC 9.6791- 9.6797) <br />The applicant has provided a Stormwater Management Plan and Drainage Study prepared by <br />Branch Engineering detailing how runoff from the development will be managed. <br />PDT 15-01 Chamotee Trails PUD Page 7 of 10 <br />