My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Comments 04-30-2015 thru 05-13-2015 (file 2 of 2)
>
OnTrack
>
CU
>
2014
>
CU 14-3
>
Public Comments 04-30-2015 thru 05-13-2015 (file 2 of 2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2015 4:05:46 PM
Creation date
5/20/2015 8:10:54 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
14
File Sequence Number
3
Application Name
ATT @ CROSSFIRE MINISTRIES
Document Type
Public Comments
Document_Date
4/30/2014
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Center for Municipal Solutions Consultants Page 1 of <br />Quick Navigation <br />Home <br />Towers and Wireless Facilities <br />Wireless What a Community Can Control <br />Wireline <br />1. Cost of Expert Assistance - Can be required to be paid for by Applicant (No Cost to <br />Biographies Community) <br />2. No towers on 'Speculation', i.e. without a service provider who can prove the need for <br />Ask a Question the facility <br />About Us 3. Verification/Determination of actual Need (How do you know that the Tower or <br />Wireless Facility is really needed? You'd Probably be surprised at how many times <br />Contact Us there is no provable need.) <br />4. Location (You can prioritize preferred locations without violating the prohibition <br />against 'zoning them out') <br />5. Height (Does it really have to be as tall as the service provider says ? Almost never!) <br />6. Visibility <br />7. Required Co-location of facilities (to minimize the number of towers) <br />8. Number of Sites in the Community <br />9. Application Fees - Amount <br />10. Non-tax Revenue (Different than Fees) <br />11. Verification of compliance with the FCC's RF Emission Standards <br />12. Aesthetics/Appearance (It doesn't have to be recognizable as a wireless facility) <br />13. Lighting can be prohibited <br />14. Setback <br />15. Signage <br />16. Screening <br />IT Structural Adequacy and Integrity <br />18. Site Security <br />19. Utilities (Underground versus Aerial) <br />20. Removal Bond (In the event tree facility is ever abandoned) <br />21. Indemnification for use of municipally-owned property <br />22. Insurance <br />23. Interference with other communications & electronic devices <br />24. Inspection to assure that what is constructed is what was permitted <br />We serve as a clearing house for information. If you have a question or if you would like other <br />information, please rill out our form. Filling it out completely will allow us to provide the best <br />solutions for your Telecommunications problems. <br />Send mail to Jim Stroltecker with questions or comments about this web site. <br />Content Copyrighted(D 2004 by The Center for Municipal Solutions, <br />Monroe Telecom Associates, LLC and Comi Telecommunication Services. All Right Protected <br />14'eb Site Designed Copyright m 2004 by Delmar Computer Services, Selkirk N.Y. 12158 All Rights Protected. <br />http://wvN,,Ar.telecomsol.com/24 items.html 6/6/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.