Rest Haven TPR Analysis (14-206) <br /> March 31, 2015 <br />3.0EXISTING CONDITIONS <br />3.1Roadway Network <br />The relevant roadways receiving traffic included in this study include: <br />Willamette Street; <br />Donald Street; <br />Crest Drive; <br />E. 33 Avenue; <br />rd <br />W. 39 Avenue, and; <br />th <br />E. 40 Avenue. <br />th <br />The following table shows the characteristics of the relevant roadways listed above: <br />Table 1: Roadway Network <br />Bike Posted <br />Roadway Jurisdiction Classification Lanes Sidewalks <br />Lanes Speed <br />Willamette City of <br />Minor Arterial 2 Yes* Yes 30 <br />Street Eugene <br />City of <br />Donald Street Major Collector2 Yes Yes 30 <br />Eugene <br />City of <br />Crest Drive Local 2 Yes No 25 <br />Eugene <br />City of Neighborhood <br />E. 33 Avenue 2 Yes No 25 <br />rd <br />Eugene Collector <br />City of Neighborhood <br />W. 39 Avenue 2 Yes No 25 <br />th <br />Eugene Collector <br />City of <br />E. 40 Avenue Major Collector2 Yes Yes 30 <br />th <br />Eugene <br />*Sidewalks present on both sides of Willamette Street to the north of W. 39 Ave and on east side to <br />th <br />the south <br /> <br /> <br />3 <br /> <br />© Branch Engineering, Inc. <br />