Written Statement <br /> Chamotee Trails PUD <br /> February 3, 2015 <br /> <br />same as the Goal 5 stream. Since OC2 12-1 determined that the Goal 5 <br />stream begins on the east side of Vivian Drive, the Headwaters stream also <br />begins on the east side of Vivian Drive and is not on the PUD. <br />The spreader location is close enough to the headwaters stream to be <br />considered <br />headwaters criteria applicable per EC 9.6793(a)(4). The swale and <br />spreader have been designed and located per the Stormwater Management <br />Manual. The Stormwater Management Plan and Drainage Study details <br />the impervious areas and how the design will restrict post-development <br />flows to pre-development rates. <br /> <br />EC 9.6794 Stormwater Oil Control <br />The PUD is not commercial or industrial and will create less than the <br />required trips and off-street parking spaces. <br /> <br />EC 9.6795 Stormwater Source Controls <br />The PUD will not include any of the improvements listed under EC <br />9.6795(2). <br /> <br />EC 9.6796 Dedication of Stormwater Easements <br />The PUD does not have any publically maintained stormwater facilities. <br /> <br />EC 9.6797 Stormwater Operation and Maintenance <br />No public waters are to be treated by the vegetated swale. Private <br />maintenance obligations of the swale will be included in the final plat. Refer <br />to the Stormwater Management Plan and Drainage Study and the <br />Stormwater Operation and Maintenance Plan for additional information. <br /> <br />(8) The applicant has demonstrated that wastewater service, transportation service, <br />stormwater service, water service, and electrical service will be provided to the site <br />prior to the need for those facilities and services. Where the facility or service is <br />not already serving the site, this demonstration requires evidence of at least one of <br />the following: <br />The public wastewater main from the Foxboro Lane manhole to the site will be <br />privately designed and constructed through the PEPI process. Transportation, <br />water and electric are available in West Amazon Drive. As established in the <br />Stormwater Management Plan and Drainage Study and the Stormwater <br />Operation and Maintenance Plan a connection to a public stormwater system is <br />not required. <br /> <br />Branch Engineering, Inc. <br /> Page 11 of 13 <br />