City of Eugene Planned Unit Development, <br />Tentative Plan, Written Statement <br />RE: 177 Day Island Rd. <br />Base Zone: C-2 Community Commercial District <br />Overlay Zones: PD Planned Unit Development; WR Water Resources. <br />EC 9.8300 Purpose of Planned Unit Development <br />The statement of purpose from EC 9.8300 indicates that the PUD provisions are intended to take a <br />holistic approach to the site design and provide a sustainable environment with, among other things, a <br />variety of dwelling types and preservation of natural resources. While not viewed as approval criteria, <br />the statement of purpose is a series of guiding principles that inform the approval criteria and to address <br />potential noncompliant conditions of other development standards. <br />EC 9.8305 Applicability <br />The PUD provisions apply to the site per Subsection (2): the property is zoned with a 'PD' overlay zone. <br />EC 9.8310 Tentative Planned Unit Development General Application Requirements <br />Subsection (1): The area included in the PUD proposal consists of a single parcel and is therefore under <br />common ownership and development control. <br />Subsection (2): The Project Team: <br />Project Coordinator: <br />Gene Bolante, AIA (OR Lic #4449) <br />Studio 3 Architecture <br />275 Court St. NE <br />Salem, OR 97301 <br />Ph: 503.390.6500 <br />Email: Rene<@studio3architecture.com <br />Civil Engineer, Land Surveyor, Arborist: <br />Ryan Mosher, PE (OR Lic #76295PE) <br />Ben Huff, PLS, El (OR Lic #84738PLS) <br />Bruce Baldwin (OR Lic #PN-6666A) <br />AKS Engineering & Forestry <br />3700 River Rd. N <br />Keizer, OR 97303 <br />Ph: 503.400.6028 <br />Email: mosherr@aks-eng.com <br />Email: benh@aks-eng.com <br />Email: bruce@aks-eng.com <br />