My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
MHT
>
2026
>
MHT 26-25
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:32:29 AM
Creation date
6/10/2026 12:42:59 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
MHT
File Year
26
File Sequence Number
25
Application Name
Jaffarian
Document Type
Application Materials
Document_Date
6/8/2026
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applicable <br />Standard Proposed / Response Complies <br />Requirement <br />process. <br />No new building footprint is <br />Structures must <br />proposed at this time. Future <br />comply with <br />detached dwelling design and <br />Building code / building code <br />MHLD lot lines will be coordinated Future / <br />ORSC requirements <br />to comply with Oregon Residential Yes <br />related to new <br />Specialty Code requirements, <br />property lines <br />including fire separation, openings, <br />projections, and access. <br />Tentative plan includes required <br />Required Required notes notes that MHLD lots may not be <br />MHLD notes must be included further divided and that the Yes <br />on tentative plan dwelling units remain middle <br />housing. <br />Based on the findings above, the parent lot can support the proposed future <br />detached duplex development, and the proposed middle housing land division is <br />consistent with the applicable middle housing lot standards, frontage/dedication <br />standards, and development standards for features included in this application. <br />This criterion is satisfied. <br />EC 9.8194(4) - Required Easements <br />Criterion / Standard: <br />The tentative plan must show easements necessary for: utilities; pedestrian <br />access from each dwelling unit to a street; common areas or shared building <br />elements; and shared driveways or parking. <br />Response: <br />The tentative plan provides a 10.8-foot-wide access and utility easement from <br />Dewey Street to the rear middle housing lot. This easement provides the rear lot <br />
The URL can be used to link to this page
Your browser does not support the video tag.