My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
ARA
>
2026
>
ARA 26-03
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 9:26:56 AM
Creation date
2/5/2026 7:06:30 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
ARA
File Year
26
File Sequence Number
3
Application Name
The Mark at Eugene
Document Type
Application Materials
Document_Date
2/4/2026
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Eugene <br />Adjustment Review Application <br />February 4, 2026 <br />Page 7 of 7 <br /> <br /> <br /> <br />As described above and illustrated on the attached plan set, the building design creates a vibrant street <br />façade with visual details on all street facing elevations and the proposed project provides multiple <br />entrances to the building. The adjustment criteria are met. <br /> <br />V. Conclusion <br /> <br />Based on the information and findings contained in this written statement, associated attachments, and <br />drawings, the proposed Adjustment Review application meets the criteria of approval in the Eugene <br />Code. Therefore, the applicant requests that the Planning Director approves the proposal as presented. <br />Both the applicant and the applicant's representative are available for questions, as necessary. <br /> <br />If you have any questions about the above application, please contact TBG Community Planning Group <br />at 541.687.1010. <br /> <br />ZG/KT <br /> <br />Z:\PROJ\202511 The Mark at Eugene\Corresp\Agency\Adj Rev-Ph 2\202511-City-ARA_WritState.docx
The URL can be used to link to this page
Your browser does not support the video tag.