My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Decision
>
OnTrack
>
MHT
>
2025
>
MHT 25-35
>
Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2025 11:32:41 AM
Creation date
12/10/2025 11:32:13 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
MHT
File Year
25
File Sequence Number
35
Application Name
Action Jackson
Document Type
Decision Document
Document_Date
12/9/2025
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eugene Water & Electric Board <br />4200 Roosevelt Blvd. <br />EWEB <br />Eugene, OR 97402 <br />Electric comments or questions can be directed to: <br />Josh Simmons <br />Distribution Engineering Technician II <br />Eugene Water & Electric Board <br />Office/fax 541-685-7184; iosh.simmons(a�eweb.org <br />Water Comments: <br />There is an existing 6" water main on east side of Jackson Street. Parcel 1 is currently served, <br />parcels 2 & 3 will need separate water services. Contact EWEB's Building and Renovation <br />Services department at (541) 685-7086 to arrange for a new service. <br />EWEB Water recommends the developer contact the Fire Marshall concerning fire protection <br />requirements for building permits. <br />EWEB water does not allow installation of any water facilities under proposed "rain gardens" or <br />any open drainage structure within the right-of-way. Provisions within the design must be made <br />to accommodate the installation of water facilities (services & hydrants) at common lot corners. <br />A minimum 5' wide "utility corridor" at service crossing and hydrant locations is required. <br />State Drinking Water regulations (OAR 333-061-0050(10)) require a minimum separation <br />between water and sewer lines of 10' where they run parallel to each other, unless the sewer <br />line is located with 1.5' of clearance lower than the water line then the required separation is 5'. <br />EWEB owned water facilities will be located in the right-of-way, or in a minimum 7' public utility <br />easement (PUE) adjacent to the public right-of-way. <br />Water comments or questions can be directed to: <br />Bill Johnson <br />Water Engineering Technician IV <br />Eugene Water & Electric Board <br />Office/Fax 541-685-7377; bill. johnson(a-).eweb.orq <br />Right -of -Way Comments: <br />Easements must be either Public Utility Easements or EWEB Easements if they are to <br />accommodate EWEB facilities. A PUE or EWEB Easement is required for the proposed lines <br />crossing proposed Parcel 2 that serve proposed Parcel 1 and 3. <br />If a Public Utility Easement is designated on the plat, the plat should include the customary Note <br />for PUEs: "No building, structure, trees, shrubbery or other obstruction shall be placed or <br />located on or in a public utility easement." <br />If an EWEB Easement is designated on the plat, a separate EWEB Easement document will <br />need to be created by EWEB Property Management. This document will be recorded with the <br />Plat. In addition, if an EWEB Easement is designated on the plat, EWEB requests that a Note <br />be added to the plat stating: "EWEB easements shall include EWEB and its joint users with <br />whom it may contract. At no time shall any building, structure, sign or other obstruction be <br />erected or placed or located within an EWEB utility easement area without prior written consent <br />of EWEB." <br />Land Use: MHT 25-35 <br />Page 2 of 3 Rz-IJ4 071 Ud• <br />
The URL can be used to link to this page
Your browser does not support the video tag.