My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Decision
>
OnTrack
>
MHT
>
2025
>
MHT 25-35
>
Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2025 11:32:41 AM
Creation date
12/10/2025 11:32:13 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
MHT
File Year
25
File Sequence Number
35
Application Name
Action Jackson
Document Type
Decision Document
Document_Date
12/9/2025
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MHT 25-35, Attachment A <br />—_ - - �-- Eugene Water & Electric Board <br />4200 Roosevelt Blvd. <br />EWEB <br />Eugene, OR 97402 <br />Date: December 1, 2025 <br />City of Eugene Planning Division <br />Attn: Gareth Warr <br />99 W loth Ave. <br />Eugene, OR 97401 <br />Re: MHT-25-35 2485 Jackson St <br />Dear Gareth, <br />EWEB staff has reviewed the Land Use Referral: MHT-25-35 Map: 18-04-01-41, TL 00800, and <br />have no objections to the proposed land -use action assuming the following comments and <br />conditions are required to be addressed by the applicant prior to obtaining electric, water, and/or <br />Fiber services from EWEB. <br />General Comments: <br />Utility services for development are provided in accordance with EWEB policies and procedures <br />which are available at our main office or online at http://www.eweb.org/policies. <br />Electric Comments: <br />EWEB has overhead electric facilities on the east side of the property. An electric service <br />extension is required to serve the new units on parcels 2 and 3. The overhead electric service to <br />the existing outbuildings cross over proposed parcel 2 for the benefit of parcel 1. Per the site <br />plans, the overhead electric service to the existing outbuilding will be relocated and placed into <br />a Public Utility Easement. Prior to or concurrent with recording the final plat, the applicant shall <br />provide EWEB with a S wide Public Utility Easement or EWEB Utility Easement. EWEB facilities <br />cannot be located within private utility easements. Extension of electric facilities will be designed <br />to meet the City of Eugene Utility Permitting ordinances, land use ordinances, EWEB standards, <br />and other applicable codes. The cost of facility relocation and extension to these parcels will be <br />borne by the requesting customer and executed under EWEB policies and procedures at the <br />time request for electric service is made. After EWEB provides the customer with an electric <br />design, typically the electric service conduit and conductors are installed by customer to current <br />codes and EWEB specifications and inspected by EWEB. The applicant or their representative <br />should reach back out to EWEB Electric to obtain an updated estimate, as the previous contact <br />was in October 2024. Distribution Engineering can be reached at 541-685-7521 or <br />DistributionEngineering@eweb.org. <br />Land Use: P l,HT 25-35 � <br />Page 1 of 3 R-dy '�1' <br />
The URL can be used to link to this page
Your browser does not support the video tag.