www.eugene-or.gov/planning <br />Planning & Development Updated: May 2024 <br />Planning Division <br />99 W. 10TH Avenue Suite 290, Eugene, OR 97401 <br />Phone: 541.682.5377 or E-mail: planning@eugene-or.gov Page 2 of 7 <br />Does your application qualify as an Expedited Land Division? My application: <br /> Includes only land that is zoned for residential uses and is within the urban growth boundary; <br /> Is solely for the purpose of residential use; <br /> Results in development that: <br /> Creates parcels that allow building residential units at 80% or more of the maximum net density permitted <br />by the underlying zoning; <br /> Will be sold or rented to households with incomes below 120% of the median family income for Lane <br />County <br />Please refer to EC 9.8515(13) or EC 9.8520(9) for a full description of these Requirements. <br />If you checked each box above, select “yes” below. If not, select “no”. <br /> Yes, my project qualifies as an Expedited Land Division <br /> No, I do not qualify <br />If you selected “yes” above, and you may opt to proceed under the requirements of an Expedited Land Division. If you <br />select the Expedited Land Division process, please include all necessary information in your application demonstrating <br />how you qualify, specifically. If you selected “no” above, please select the “standard” process below. <br />Please check one option: <br /> Standard Process (EC 9.7200-9.7230) <br /> Expedited Land Division process (9.7900-9.7925) <br />Neighborhood/Applicant Meeting Requirements <br />Provide the following documentation that a neighborhood/applicant meeting was held per EC 9.7007 (see EC 9.7010): <br />The list of persons to whom notice was mailed pursuant to EC 9.7007(5) and a signed statement that notice was <br />posted and mailed to those on the list; <br />A copy of the notice; <br />A copy of the meeting notes and sign-in sheet described at EC 9.7007(9); and <br />A copy of the site plan presented at the meeting. <br />Filing Fee <br />A filing fee must accompany all applications. The fee varies depending upon the type of application and is adjusted <br />periodically by the City Manager. Check with Planning staff at the Permit and Information Center to determine the <br />required fee or check website at: www.eugeneplanning.org <br />Submittal Requirements <br />Provide 2 paper copies and one digital copy (CD, USB Drive, or Other) of all application materials (i.e. written statement, <br />site plans, etc.). Digital files must be in PDF file format. Please note that it is the applicant’s responsibility to make sure <br />that the digital and paper copies are identical. Following completeness review, an updated digital and paper copies may <br />be required. All paper site plans must be folded to a size equal or less than 11” x 17”. <br />Written Statement <br />Clearly state whether the application is to be reviewed under the General or Housing/Clear and Objective criteria. <br />Submit a detailed written statement describing how this request is consistent with all applicable criteria (Sections <br />*meeting is scheduled for September 22, 2025 at 6:00pm <br />** these will be submitted all together as soon as meeting is held ** <br />** <br />** <br />** <br />**