Re: TIA Scope of Work <br />Date: 2.26.25 <br />Page 5 <br /> <br /> <br /> <br /> SANDOW ENGINEERING <br /> <br />• AM Peak Period 7-9 AM <br />• PM Peak Period 4-6 PM <br />• Growth Rate: City Standard of 2% <br />• Analysis to include: <br />⋅ LOS <br />⋅ V/C <br />⋅ Queuing <br />⋅ Crash Analysis <br />⋅ Mitigation evaluation, including signal warrants, turn pockets, etc. <br />• As per the City of Eugene standards (R-9.8650-F), the evaluation is to include all site <br />accesses and all intersections that will receive 50 or more development trips. The <br />evaluation will include: <br />⋅ Site Access to Chad Drive <br />⋅ Coburg Road at Chad Drive <br />⋅ Coburg Road at Beltline WB Ramps <br />⋅ Coburg Road at Beltline EB Ramps <br />⋅ Chad Drive at Shadow View Drive <br /> <br />