Re: TIA Scope of Work <br />Date: 2.26.25 <br />Page 4 <br /> <br /> <br /> <br /> SANDOW ENGINEERING <br /> <br /> <br />Trip Distribution PM Peak Hour <br /> <br /> <br /> <br />ANALYSIS PARAMETERS <br />The site will add an additional 100 peak hour trips, triggering a TIA. <br />The following analysis is proposed for this project. <br />• Years <br />⋅ 2025- Existing <br />⋅ 2026- Full Build Out <br />⋅ 2031- 5 years after buildout