My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
TIA
>
2025
>
TIA 25-02
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 10:20:46 AM
Creation date
6/12/2025 8:34:59 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
TIA
File Year
25
File Sequence Number
2
Application Name
Slocum Surgery center
Document Type
Application Materials
Document_Date
6/11/2025
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> 35 Slocum TIA April 22, 2025 <br /> <br />Access Spacing <br /> <br />(c) Access connection spacing requirements will be reduced up to a maximum of <br />50% of the required spacing, upon applicant request, if either 1. or 2.: <br /> 1. Both of the following conditions are met: <br />a. The proposed access connection is abutted by two or more <br />directional travel lanes or an auxiliary deceleration lane; and <br />b. The applicant proposes a restricted movement access connection, <br />including but not limited to median barriers or directional in/ out <br />barriers. <br />2. Physical conditions preclude locating the access connection on the street <br />with the lower classification. Such conditions may include, but are not <br />limited to, topography, trees, existing buildings or other existing <br />development on the subject property or adjacent property. <br />The applicant is not proposing to reduce the standard. This standard is not applicable.
The URL can be used to link to this page
Your browser does not support the video tag.