My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Testimony Batch 2
>
OnTrack
>
CA
>
2024
>
CA 24-3
>
Testimony Batch 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2024 8:15:21 AM
Creation date
11/8/2024 8:14:28 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
24
File Sequence Number
3
Application Name
Stormwater Code Amendments
Document Type
Public Testimony
Document_Date
11/7/2024
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05-6) fulfills the applicable criteria for final planned unit development approval, as set forth in EC <br />9.8365. Therefore, final planned unit development approval is granted without condition. <br />The following information items are provided for the applicant's benefit. Implementation will <br />be required at the time of building permit <br />Sidewalk construction along each lot will be required as part of the building permit approval for <br />each unit. <br />Driveways onto public streets shall not be curb return types; a standard apron design shall be <br />used. <br />Compliance with the EC 9.6725 Outdoor Lighting Standards will be reviewed at the time of <br />building permit. <br />Specific plantings consistent with EC 9.6210(3) High Screen Landscape Standard (L-3) must be <br />shown on the building permit plans along the northern property lines of Blocks H and K (north <br />of Tract B and Lot 57 of the Crescent Village 2nd Addition Subdivision) <br />Post Approval: <br />Pursuant to Eugene Code Section 9.7220(3), the decision of the Planning Director is effective on the <br />13th day after notice of the decision is mailed, unless appealed according to the procedures in EC <br />9.7605. The final PUD approval shall remain effective for 36 months following the effective date <br />of approval, in accordance with EC 9.7230. Within that time period, the applicant is required to <br />submit 5 copies of the final plan meeting the applicable condition(s) of approval, and to execute a <br />performance agreement in accordance with EC 9.7025. <br />This approval does not relieve the applicant from complying with other applicable provisions of the <br />Eugene Code, Oregon Revised Statutes, or any other laws which may govern the development of <br />the subject property. <br />Planning Director <br />Crescent Village Phase 1 (PDF 05-6) - September 2005 Paize 6 <br />Approval Granted By:
The URL can be used to link to this page
Your browser does not support the video tag.