My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Testimony – Open Record Part 3 – July 31 to August 14, 2024
>
OnTrack
>
PDT
>
2024
>
PDT 24-1
>
Public Testimony – Open Record Part 3 – July 31 to August 14, 2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2024 3:11:34 PM
Creation date
8/15/2024 9:44:55 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
24
File Sequence Number
1
Application Name
BRAEWOOD HILLS 3RD ADDITION
Document Type
Public Testimony
Document_Date
8/14/2024
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Eugene 180 West 8th Avenue, Ste. 200 Eugene, OR 97401 541-682-5264 <br /> <br /> <br /> <br /> <br /> <br />EC 9.6815 Street Connectivity: <br />As discussed in the findings and the conditions of approval found under EC 9.6815 in the staff report <br />for PDT 24-01, the proposed PUD can comply with this criterion. The applicant has submitted an <br />additional memorandum dated July 31, 2024, demonstrating that a public street connection from the <br />existing intersection of Randy Lane and Blacktail Drive then connecting to Hawkins Lane cannot <br />comply with City of Eugene standards (PIDS Manual section 2.05(J)(4)) related to maximum <br />allowable slopes. The secondary access standards at EC 9.6815(2)(d) are satisfied by the proposed <br />construction of emergency vehicle turn arounds at the terminus of the proposed street system within <br />the development site. The secondary access standards are also satisfied by the existing intersection <br />of Randy Lane and Blacktail Drive, which will allow for access to the existing street system to the <br />north (Hawkins Lane) to the east (Blacktail Drive) and to the west (Timberline Drive). <br /> <br />EC 9.6790-9.6797 Stormwater: <br />As discussed in the findings and the conditions of approval found under EC 9.6790-9.6797 in the staff <br />report for PDT 24-1, the proposed PUD can comply with this criterion. Additionally, the applicant has <br />submitted an updated memorandum dated July 31, 2024. In the updated memo, the applicant <br />further elaborates on any differences between the applicant’s current stormwater report and the <br />previous stormwater report (PDF 03-1). As noted in the applicant’s updated memo, the previous <br />stormwater report analyzed a basin area of 30.23 acres, while the applicant’s stormwater report <br />analyzes a basin area of 12.39 acres which would account for the differences in the Time of <br />Concentration (PDF 03-1, 39.3 minutes compared to PDT 24-1, 17 minutes). As discussed in the staff <br />report, the proposed stormwater system has been sized in order to detain runoff from the proposed <br />private streets, shared driveways and with the assumption factor that each lot will have 20% of its <br />square footage consist of impervious surface. <br /> <br />Due to the possibility of Middle Housing permitted under the State’s Middle Housing Model Code on <br />the future lots of the proposed PUD, the future development of Middle Housing may result in a <br />greater surface area of impervious surface then assumed in the original stormwater memo (30%). <br />However, under the State Model Code the impervious surface area may exceed the assumed <br />impervious surface coverage because it allows middle housing to be developed to the Floor Area <br />Ratio limits included in the Model Code. The updated stormwater report notes that “To detain this <br />higher volume, more pipes would be added to the detention system. This approach is modular and <br />easily scalable.” However, at this time the applicant has not submitted any further materials <br />demonstrating the feasibility of this proposal. Based on the above findings PW staff recommends the <br />following condition of approval: <br /> <br />x The applicant shall submit an updated stormwater memo, demonstrating the feasibility of a <br />proposed stormwater detentions system where the proposed lots are developed with Middle
The URL can be used to link to this page
Your browser does not support the video tag.