Larry Smith, Videra Drive HOA <br />5  <br /> <br />This section is largely intended to provide background for the following sections of this discussion which <br />state more specific concerns. However, there are requests we make of the Planning Department at this <br />point which we believe will result in an acceptable plan: <br />A) Stormwater control is the major concern we share over the entire project and yet it is a concern <br />not given serious attention in the current proposal, deferring analysis to the construction permit <br />phases. Even though it has become customary to defer specific stormwater plans to a later phase <br />in the application process, we ask that you require the applicant to present an analysis and design <br />strategy in this tentative application which addresses the entire parcel in a comprehensive <br />fashion. Granting permission to subdivide before such plans are clear would make it impossible to <br />implement an effective stormwater control solution. <br /> <br />B) Understanding that there may be flexibility in many decisions which balance the competing goals <br />of the applicant and the public, we ask that the Planning Director remain true to the intent for <br />Goal 5 property and stormwater control and enforce the code strictly in this case, granting no <br />waivers or exceptions <br />Page 55 of 87