Tentative Planned Unit Development Completeness Review Form Page 4 of 4 <br /> <br />☒ ☐ ☐ ☐ <br />58. Submitted a legal description of the property included in the planned <br />unit development application. This legal description is typed on an 8½" <br />x 11" white sheet of paper (no letterhead) so that it is suitable for <br />recording <br />☒ ☐ ☐ ☐ 59. Submitted a preliminary title report. <br />☐ ☐ ☐ ☒ 60. Submitted a completed Public Works Property Review Checklist (if <br />available) and any supporting or required documentation. <br />☒ ☐ ☐ ☐ <br />61. If application requires notification to Oregon Division of State Lands <br />concerning potential wetland permit requirements (on Eugene LWI or <br />WEWP Inventory Maps), notification form and related map is prepared <br />and attached (by staff). (ORS 227.350) <br /> *Planner: for necessary forms, Click here. <br />☐ ☐ ☐ ☒ 62. Submitted a Geotechnical Analysis <br />Comments <br /> <br />NOTICE STATEMENT: If the Eugene/Springfield Fire Marshall (or the Fire Marshal’s designee) determine that there is <br />inadequate water supply, apparatus access, or both, to the site for the development of one and two family dwellings that will <br />be subject to the Oregon Residential Specialty Code, the Eugene Building Official (or the Building Official’s designee) may <br />require compliance with one or more of the fire suppression or fire containment Uniform Alternate Construction Standards <br />set out at OAR 918-480-0125(4) and (5). <br /> <br /> <br />For Staff Use Only - Referral Information <br />Yes No <br />☒ ☐ 1. Route land use referral to Privately Engineering Public Improvement (PEPI). <br />☐ ☒ 2. Route land use referral to Public Works Maintenance. <br />☐ ☒ 3. Is the right-of-way county maintained? If yes, route land use referral to Lane County <br />Transportation and Lane County Road Maintenance Planning. <br />☐ ☒ 4. Route to Bonneville Power Administration (if site includes a BPA easement) <br />☐ ☒ 5. Does the resulting change create a split zone or split overlay zone? If Yes, please send referral to <br />Thea Evans or Planning GIS Specialist <br />☐ <br />6. Other: <br /> <br /> <br /> <br /> <br /> <br /> <br />