My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Deemed Incomplete 2024.03.25
>
OnTrack
>
MHT
>
2024
>
MHT 24-2
>
Application Deemed Incomplete 2024.03.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2024 4:33:10 PM
Creation date
4/15/2024 4:33:06 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
MHT
File Year
24
File Sequence Number
2
Application Name
1963 VILLARD STREET
Document Type
Application Complete Letter
Document_Date
3/25/2024
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Middle Housing Land Division, Tentative Completeness Review Form Page 3 of 3 <br /> <br />Street and Utility Improvement Requirements <br />☒ ☐ ☐ ☐ <br />1. Show that utility plans comply with Eugene Code Section 9.6775, <br />Underground Utilities, as well as EC 9.8194(5), Separate Utilities for each <br />Middle Housing unit. <br /> <br />NOTICE STATEMENT: If the Eugene/Springfield Fire Marshall (or the Fire Marshal’s designee) determine that there is <br />inadequate water supply, apparatus access, or both, to the site for the development of one and two family dwellings that will <br />be subject to the Oregon Residential Specialty Code, the Eugene Building Official (or the Building Official’s designee) may <br />require compliance with one or more of the fire suppression or fire containment Uniform Alternate Construction Standards <br />set out at OAR 918-480-0125(4) and (5). <br /> <br /> <br />For Staff Use Only - Referral Information <br /> <br />Yes No <br />☐ ☒ <br />2. Does Building Permit Services require a referral for this application? (Is a <br />residential structure setback less than 3 feet from any new property <br />line? <br /> ☐ ☒ <br />3. Is the right-of-way county maintained? If yes, route land use referral to <br />Lane County Transportation and Lane County Road Maintenance <br />Planning. <br /> ☐ ☒ 4. Route to Bonneville Power Administration (if site includes a BPA <br />easement) <br /> ☐ ☒ <br />5. Does the resulting change create or eliminate a split zone or split <br />overlay zone? If Yes, please send referral to Thea Evans or Planning GIS <br />Specialist <br /> ☐ 6. Other: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.