<br />Middle Housing Land Division, Tentative Completeness Review Form Page 3 of 3 <br /> <br />Street and Utility Improvement Requirements <br />☒ ☐ ☐ ☐ <br />1. Show that utility plans comply with Eugene Code Section 9.6775, <br />Underground Utilities, as well as EC 9.8194(5), Separate Utilities for each <br />Middle Housing unit. <br /> <br />NOTICE STATEMENT: If the Eugene/Springfield Fire Marshall (or the Fire Marshal’s designee) determine that there is <br />inadequate water supply, apparatus access, or both, to the site for the development of one and two family dwellings that will <br />be subject to the Oregon Residential Specialty Code, the Eugene Building Official (or the Building Official’s designee) may <br />require compliance with one or more of the fire suppression or fire containment Uniform Alternate Construction Standards <br />set out at OAR 918-480-0125(4) and (5). <br /> <br /> <br />For Staff Use Only - Referral Information <br /> <br />Yes No <br />☐ ☒ <br />2. Does Building Permit Services require a referral for this application? (Is a <br />residential structure setback less than 3 feet from any new property <br />line? <br /> ☐ ☒ <br />3. Is the right-of-way county maintained? If yes, route land use referral to <br />Lane County Transportation and Lane County Road Maintenance <br />Planning. <br /> ☐ ☒ 4. Route to Bonneville Power Administration (if site includes a BPA <br />easement) <br /> ☐ ☒ <br />5. Does the resulting change create or eliminate a split zone or split <br />overlay zone? If Yes, please send referral to Thea Evans or Planning GIS <br />Specialist <br /> ☐ 6. Other: <br /> <br />