My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23_10_17 Bacth2 Testimony
>
OnTrack
>
MA
>
2023
>
MA 23-5
>
23_10_17 Bacth2 Testimony
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2023 12:31:17 PM
Creation date
10/17/2023 12:22:35 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
MA
File Year
23
File Sequence Number
5
Application Name
River Road-Santa Clara Neighborhood Plan
Document Type
Public Testimony
Document_Date
10/17/2023
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
708
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. The final PUD site plans and drainage details shall be modified to either meet the design <br />standards for swales, or labeled as a different facility with the appropriate design details <br />provided. <br />5. The final PUD site plans shall be modified to show that the future solid waste storage <br />area will comply with all applicable Source Control standards in the Stormwater <br />Management Manual, including cover as specified in section 3.4.2. <br />6. Final PUD plans shall include the note: "Onsite stormwater management facilities will be <br />privately owned and operated. An operation and maintenance plan will be developed <br />consistent with the City's Stormwater Management Manual, and notice of this plan will <br />be recorded during the building permit process." <br />7. A seven (7) foot wide landscape bed, meeting requirements of EC 9.6210(3) High <br />Landscape Standard (L-3), shall be shown on the final PUD site plans, for the parking <br />areas along the north and east property lines for the length of the pavement. <br />Attachments: <br />The applicant's site plan (reduced size) is attached to this report for ease of reference, however <br />all record materials are available for review at the Planning Division. Copies or emails of these <br />additional materials can be provided upon request. The Hearings Official will be provided a full <br />set of the applicant's materials for review, and the full application file will be made available at <br />the public hearing. <br />Attachment A: Vicinity Map <br />Attachment B: Zoning Map <br />Attachment C: Applicant's Site Plan (reduced) <br />For More Information: <br />Please contact Althea Sullivan, Assistant Planner, Eugene Planning Division, by phone at (541) <br />682-5282, or by e-mail, at althea.c.sullivan@ci.or.us <br />McKenzie Living Staff Report May 2016 18 <br />HO Agenda - Page 51 <br />201
The URL can be used to link to this page
Your browser does not support the video tag.