My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet
>
OnTrack
>
Z
>
2022
>
Z 22-2
>
Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 4:02:27 PM
Creation date
4/6/2022 1:29:12 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
Z
File Year
22
File Sequence Number
2
Application Name
CLAIRE SENDERLING
Document Type
Staff Report
Document_Date
4/13/2022
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment C <br />Exhibit C <br />throughout this report, the annexation is consistent with State law. <br />Therefore, based on the findings above, the proposal is consistent with the applicable <br />policies of the Metro Plan and the WAP refinement plan. <br />EC 9.7825(3) The proposed annexation will result in a boundary in which the minimum level of key <br />urban facilities and services, as defined in the Metro Plan, can be provided in an <br />orderly, efficient, and timely manner. <br />Com <br />plies <br />Findings: Consistent with this criterion, the proposed annexation will result in a <br />® <br />❑ <br />boundary in which the minimum level of key urban facilities and services can be <br />YES <br />NO <br />provided in an orderly, efficient, and timely manner as detailed below: <br />Wastewater <br />Public wastewater was constructed during the Garden Way improvements project in <br />2001. Neither the residence at 132 nor the residence at 158 S. Garden Way appear to be <br />connected to the public system and are most likely on septic service. There is an 8-inch <br />wastewater line within the S. Garden Way right-of-way and a 10-inch wastewater line to <br />the south in an easement connecting Kinsrow Avenue to S. Garden Way. An on-hold <br />assessment exists which is currently $12,434.87 through June 2022 and will be due upon <br />future redevelopment of the site. <br />Stormwater <br />A public storm system exists within the S. Garden Way right-of-way. The soils for these <br />lots appear to have fairly good infiltration, therefore a number of options are available <br />for treatment prior to discharge to the public system or on-site retention. Future <br />development proposals must demonstrate consistency with flood control standards. Any <br />proposed stormwater plan will be reviewed for compliance with the Stormwater <br />Management Manual and City of Eugene development code at the time of future <br />development. <br />Transportation <br />Both parcels have frontage on S. Garden Way, a minor arterial owned and maintained by <br />the City of Eugene and fully developed with setback sidewalks, curb and gutter, <br />streetlights, street trees, and a planted median separating the north and south travel <br />lanes. Any future redevelopment will be required to meet the development standards of <br />Eugene City code. <br />Solid Waste <br />Collection service is provided by private firms. Regional disposal sites and the Short <br />Mountain Landfill are operated by Lane County. <br />Water and Electric <br />EWEB Water staff state no objection to the annexation. EWEB Electric staff state no <br />objection to the annexation. An existing EWEB easement across the property will not be <br />affected by the proposed annexation. <br />Cornerstone Community Housing (A 21-8) August 2021 Page 3 <br />Page 39 of 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.