c K1nn\ /ENGINEERING <br />160 MADISON STREET, SUITE A EUGENE, OREGON 97402 541.513.3376 <br />TECH MEMO <br />DATE: September 9, 2021 <br />TO: Colin McArthur, AICP <br />Cameron McCarthy <br />FROM: Kelly Sandow, P.E. <br />Sandow Engineering <br />RE: Peak Hour Trip Generation - University of Oregon Indoor Football Practice Facility <br />Willamette Greenway Permit <br />As per your request, the following provides a peak hour trip generation estimate for the <br />University of Oregon's proposed Indoor Football Practice Facility Willamette Greenway permit. <br />Project Information <br />The U of O is proposing the construction of a new indoor football practice facility within the <br />Autzen Stadium complex. Currently on the west side of the complex (west of the Moshofsky <br />Center and Hatfield Dowlin Complex) there are two outdoor practice football fields. The <br />proposal is to replace both of the two outdoor practice fields with one indoor practice field. <br />The new 152,510 square foot building contains the practice field and accessory areas, <br />RENEWAL 06/30/22 <br />mechanical areas, storage, and an expansion to the weight room. <br />