University of Oregon <br />Indoor Football Practice Facility <br />Willamette Greenway Permit Application September 23, 2021 <br />C. Two-foot contour intervals for ground slopes between five and <br />ten percent. <br />This requirement does not apply. <br />d. Five-foot contour intervals for ground slopes exceeding ten <br />percent. <br />This requirement does not apply. <br />e. Indicate which bench mark used. <br />The City Bench Mark is indicated on Sheet C1.000 Existing Conditions Plans (Exhibit A). <br />f. Existing vegetation to be preserved shall be shown on contour <br />map. <br />Existing vegetation is shown on Sheet C1.000 Existing Conditions Plans (Exhibit A). <br />10. Storm Drainage Requirements <br />a. Show the location and flow line elevation of the existing piped <br />public system at proposed connection point(s). <br />Location and flow line elevation of the existing storm drainage lines are shown on <br />Sheet C2.000 Utility and Stormwater Plan (Exhibit A). <br />b. Show existing and proposed storm drainage, including disposition <br />of storm water for all lots. <br />Existing and proposed storm drainage, including disposition of storm water, is shown <br />on Sheet C2.000 Utility and Stormwater Plan (Exhibit A). Disposition for the project will <br />be met by offsite discharge to the existing public storm system in MLK Jr. Boulevard. <br />C. A description of the extent to which a watercourse will be altered <br />or relocated as a result of proposed development, including a <br />Stormwater analysis of pre- and post-development flows. <br />This standard is not applicable. <br />CAMERON MCCARTHY 17 <br />