My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
WG
>
2021
>
WG 21-3
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2021 4:03:44 PM
Creation date
10/19/2021 9:54:42 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
WG
File Year
21
File Sequence Number
3
Application Name
UO INDOOR FOOTBALL PRACTICE FACILITY
Document Type
Application Materials
Document_Date
10/15/2021
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
University of Oregon <br />Indoor Football Practice Facility <br />Willamette Greenway Permit Application September 23, 2021 <br />f. Show designated carpool and vanpool parking spaces for <br />developments with 20 or more employees. <br />The proposal does not involve a development with 20 or more employees. This <br />requirement does not apply. <br />7. Wastewater Requirements <br />a. Show the location and flow line elevation of the existing public <br />wastewater sewer at proposed connection point(s). <br />Location and flow line elevation of existing public wastewater lines are shown on Sheet <br />C2.000 Utility and Stormwater Plan (Exhibit A). <br />b. Show the existing and proposed wastewater sewer layout. <br />Wastewater sewer lines are shown on Sheet C2.000 Utility and Stormwater Plan (Exhibit <br />A). <br />8. Water Supply <br />a. Show diameter of existing and proposed water main. <br />The location and diameter of the existing and proposed water main in shown on Sheet <br />C2.000 Utility and Stormwater Plan (Exhibit A). <br />b. Show existing and proposed fire hydrants. <br />Fire hydrants are shown on Sheet C2.000 Utility and Stormwater Plan (Exhibit A). <br />9. Contour Intervals <br />a. Must be shown as below and must be based on City Bench Mark. <br />The City Bench Mark used must be noted on the plans. <br />The City Bench Mark is noted on Sheet C1.000 Existing Conditions Plans (Exhibit A). <br />b. One-foot contour intervals for ground slopes up to five percent. <br />One-foot contour intervals are shown on Sheet C1.000 Existing Conditions Plans (Exhibit <br />A). <br />CAMERON MCCARTHY 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.