University of Oregon <br />Indoor Football Practice Facility <br />Willamette Greenway Permit Application September 23, 2021 <br />f. Show designated carpool and vanpool parking spaces for <br />developments with 20 or more employees. <br />The proposal does not involve a development with 20 or more employees. This <br />requirement does not apply. <br />7. Wastewater Requirements <br />a. Show the location and flow line elevation of the existing public <br />wastewater sewer at proposed connection point(s). <br />Location and flow line elevation of existing public wastewater lines are shown on Sheet <br />C2.000 Utility and Stormwater Plan (Exhibit A). <br />b. Show the existing and proposed wastewater sewer layout. <br />Wastewater sewer lines are shown on Sheet C2.000 Utility and Stormwater Plan (Exhibit <br />A). <br />8. Water Supply <br />a. Show diameter of existing and proposed water main. <br />The location and diameter of the existing and proposed water main in shown on Sheet <br />C2.000 Utility and Stormwater Plan (Exhibit A). <br />b. Show existing and proposed fire hydrants. <br />Fire hydrants are shown on Sheet C2.000 Utility and Stormwater Plan (Exhibit A). <br />9. Contour Intervals <br />a. Must be shown as below and must be based on City Bench Mark. <br />The City Bench Mark used must be noted on the plans. <br />The City Bench Mark is noted on Sheet C1.000 Existing Conditions Plans (Exhibit A). <br />b. One-foot contour intervals for ground slopes up to five percent. <br />One-foot contour intervals are shown on Sheet C1.000 Existing Conditions Plans (Exhibit <br />A). <br />CAMERON MCCARTHY 16 <br />