My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
WG
>
2021
>
WG 21-3
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2021 4:03:44 PM
Creation date
10/19/2021 9:54:42 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
WG
File Year
21
File Sequence Number
3
Application Name
UO INDOOR FOOTBALL PRACTICE FACILITY
Document Type
Application Materials
Document_Date
10/15/2021
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
University of Oregon <br />Indoor Football Practice Facility <br />Willamette Greenway Permit Application <br />September 23, 2021 <br />The new facility is designed to be low energy by employing natural ventilation and <br />daylight for much of the year while maintaining ambient conditions that adhere to <br />NCAA comfort guidelines, supplemented with an efficient HVAC system only when <br />needed due to weather extremes. <br />New tree plantings and a meadow mix are proposed along the western perimeter, <br />abutting the facility and the intersection of Leo Harris Parkway and MLK Jr. Boulevard, <br />as illustrated on Sheet 1-1.00 Materials and Planting Plan (Exhibit A). The proposed <br />development includes several flexible plaza spaces. A north courtyard is located north <br />of the site, and a new pedestrian access gate is proposed. In addition, a row of new <br />trees are proposed along MLK Boulevard to the north and east. <br />CAMERON MCCARTHY 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.