University of Oregon <br />Indoor Football Practice Facility <br />Willamette Greenway Permit Application <br />September 23, 2021 <br />Blvd. Prior construction at the complex resulted in the UO installing 8-foot wide <br />setback sidewalks along the south side of MLKJr. Blvd., east of Leo Harris Parkway, and <br />8-foot wide curbside sidewalks along the north side of Leo Harris Parkway. Existing <br />sidewalks along MLKJr. Blvd. and along the south side of Leo Harris Parkway west of <br />the canoe canal are 12-feet wide. <br />The area's network of on-street bike lanes and off-street paths also provides convenient <br />bicycle access to the complex, where 427 bicycle parking spaces are provided (86 <br />covered spaces and 341 uncovered spaces). The DeFazio Bridge and other <br />improvements in the Ferry Street Bridge corridor provide capacity and access to the <br />complex from the downtown and Coburg Road areas for spectators using alternative <br />modes of transportation. Transit use for complex events is currently provided by a <br />series of transit stops located along MLKJr. Blvd. <br />CAMERON MCCARTHY 9 <br />