DOWNTOWN RIVERFRONT <br />LAND USE COMPONENTS <br />CA 19-1, RA 19-1, Z 19-5, WG 19-3, ST 19-3, and SDR 19-2 April 19, 2019 <br />Figure 2-2. Downtown Riverfront Concept Plan 2,3 <br />z Downtown Riverfront Concept Plan, January 2018. Williams/Dame Associates and SERA Architects. <br />s The regulatory approvals necessary for construction of the proposed bridge across the Willamette River, as <br />shown in Figure 2-2, are not included in this proposal. <br />City of Eugene FINAL SUBMITTAL <br />9 <br />