❑ ® 25. Is a Hazardous Materials Review application required? <br />Comments: <br />Street and.Public Access Way Requirements <br />Submitted' <br />-Missing <br />Incomplete <br />N/A <br />26. Identify the number of peak hour trips based on the likely development <br />that will occur on all lots resulting from the land division. If the <br />® <br />❑ <br />❑ <br />❑ <br />development will generate 100 or more trips during any peak hour, a <br />Traffic Impact Analysis Review is required in accordance with 9.8650 - <br />9.8680. <br />❑ <br />❑ <br />® <br />❑ <br />27. Show street names for all existing and proposed streets (public and <br />private) and identify the street classification. <br />❑ <br />❑ <br />❑ <br />® <br />28. Indicate potential slope easements. <br />❑ <br />❑ <br />❑ <br />® <br />29. Delineate any street segments where grade exceeds 15% percent, where <br />driveways are prohibited. <br />❑ <br />❑ <br />❑ <br />® <br />30. Provide a street center profile using ground elevations of proposed streets <br />at or exceeding 15% grade. <br />31. Show location and widths (right-of-way and paving width) of all existing <br />❑ <br />❑ <br />® <br />❑ <br />and proposed streets, intersections, and bike and pedestrian access ways, <br />both within the plat and adjacent to the lat. <br />® <br />❑ <br />❑ <br />❑ <br />32. Show-existing and proposed curbs and-sidewalks on site and adjacent to <br />property involved. <br />® <br />❑ <br />❑ <br />❑ <br />33. Address EC 9.6815 Street Connectivity and provide supporting narrative <br />or if re uestin an exception, provide justifications. <br />® <br />❑ <br />❑ <br />❑ <br />34. Show that the proposal is consistent with Eugene Code Section 9.6780, <br />Vision Clearance Area. <br />❑ <br />❑ <br />❑ <br />® <br />35. Indicate radii of all street curves on the plans. <br />® <br />❑ <br />❑ <br />❑ <br />36. Show location and type of existing and proposed transit-related facilities. <br />❑ <br />❑ <br />❑ <br />® <br />37. Show existing and proposed special setbacks, in accordance with Eugene <br />Code Section 9.6750. <br />❑ <br />❑ <br />❑ <br />® <br />38. Submit an Alternative Traffic Safety Study (ATSS) if an adjustment is <br />request d to the required internal vehicle stacking at EC 9.6703(3)(a). <br />® <br />El <br />❑ <br />❑ <br />39. Show all existing access driveways to the property. <br />❑ <br />® <br />❑ <br /> <br />40. Demonstrate that access to the development site is located in accordance <br />with EC 7.420. <br />41. Submit an ATSS (or address in written statement) if requesting more than <br />❑ <br />® <br />❑ <br />❑ <br />one access connection for a single development site and/or requesting that <br />an access connection be wider than 20 feet. <br />, ,,,.ati <br />; <br />. <br /> <br />1 <br />l <br />d <br />raft : erdanee •°4 EG <br />42 <br />d <br />t <br />i <br />❑ <br />❑ <br />❑ <br />❑ <br />e <br />n <br />-ne <br />u <br />e <br />e f <br />pe <br />es <br />r <br />an <br />. <br />9-6738. <br />27 - Proposed street name for N/S Connector Road? <br />31-Address how Table 9.6870 is met, include ROW width, paving width (curb to curb), for the proposed <br />Comments' <br />classification of the new street. <br />40/41- The site is currently undeveloped, and is subject to EC 9.6735(2)/EC 7.420. Please address in written <br />statement. <br />42 - Per planning review: <br />For Staff Use Only - Referral Inf6rmation <br />Yes <br />No <br />❑ <br />43. Does Parks Planning require a referral for this application? Yes, if <br />j <br />acent to a city ark. <br />property is one acre or larger and ad <br />44. Is the right-of-way under Lane County jurisdiction? If yes, route land <br />❑ <br />® <br />use referral to Lane County Transportation and Lane County Road <br />Maintenance Planning. <br />® <br />45. Is a referral to PWM or PEPI required? Yes, if there are public <br />improvements. <br />46. Does stormwater discharge to a facility' within Junction City Water <br />❑ <br />Control District? If yes, route land use referral to Junction City <br />Water Control District, Attn: Steve Cornacchia. <br />Planned Unit Development Completeness Review Form Revised 6/2015 Page 3 of 4 <br />