14. Application proposes construction of public streets; provide stormwater <br />treatment plan for public streets based on infiltration, filtration, or <br />® <br />❑ <br />❑ <br />❑ <br />mechanical priority and include sizing calculations that demonstrate <br />whether treatment of runoff from adjoining lots will be on-site or in <br />public infiltration or filtration facility in the right of way. <br />15. Application proposes construction of private street(s) and/or shared <br />driveway(s); provide stormwater treatment plan for private street(s) and <br />❑ <br />❑ <br />❑ <br />® <br />shared driveway(s) based on infiltration and filtration priority and include <br />sizing calculations that demonstrate whether treatment of runoff from <br />adjoining lots will be on-site or in private shared facility. <br />16. Application (CUP/SR/PUD) includes impervious surface area to be <br />® <br />❑ <br />❑ <br />❑ <br />constructed with a future development permit; provide stormwater <br />treatment plan and analysis for runoff from impervious surface area based <br />on infiltration, filtration or payment priority. <br />17. If applicable, identify flow control by demonstrating how there is no <br />❑ <br />❑ <br />❑ <br />® <br />increase in flow rates or volumes if contributing to a Headwaters Area <br />waterway, per EC 9.6793(3)(a). <br />® <br />❑ <br />❑ <br />❑ <br />18. Submit three copies of stormwater analysis that demonstrate compliance <br />with stormwater drainage provisions at EC 9.6790 - 9.6795. <br />❑ <br />❑ <br />❑ <br />® <br />19. If adjustment request includes Stormwater Quality/Flow Control, an <br />approved alternative design was submitted. <br />❑ <br />❑ <br />❑ <br />® <br />20. If adjustment request includes Source Control, a DAR form was <br />submitted. <br />❑ <br />❑ <br />❑ <br />® <br />21. The applicant has submitted approval from Lane County for proposed <br />stormwater discharge to Lane County systems. <br />-Comments: <br />Geotechnical"Report Requirements <br />Submitted <br />Missing/ <br />Incomplete / <br />/ <br />Inconsistent _ <br />Unsupported <br />N/A <br />- <br />The applicant's analysis must address EC 9.6710 and AO 58-02-25-F. <br />Complete <br />Data <br />Data <br />22. Level 1 Geotechnical Analysis has been submitted because the <br />development includes public improvements or has site slopes <br />between 5 and 10 percent. The report includes: required record <br />® <br />❑ <br />❑ <br />data; a description of the development and property;a specific <br />statement regarding the absence or presence of unstable soils; and <br />concludes that the site is suitable for the proposed development <br />without further investigation or recommendations. Level 3 is <br />required ifspecific recommendations are necessary <br />23. Level 2 Geotechnical Analysis has been submitted because the <br />development includes public improvements and has site slopes' <br />equal to or greater than 10%. The report includes: all of the Level <br />❑ <br />❑ <br />❑ <br />❑ <br />L information above; test pit locations consistent with the interval <br />requirements in Exhibit A of AO 58-02-25-F; and test pit results are <br />profiled and show soil classifications and ground water elevation. <br />Conclusion must also be per Level 1; if not, a Level 3 is required. <br />24. Level 3 Geotechnical Analysis has been submitted because either <br />of the required Level 1 or Level 2 reports identified potential <br />stability issues that necessitate design-specific geotechnical <br />recommendations. The report includes: all of the requirements of <br />Levels 1 and 2 above; design recommendations for structures, <br />❑ <br />❑ <br />❑ <br />❑ <br />foundations, compacted fill, cut/fill lines, earthwork, and streets; <br />mitigation measures for seismic hazards, landslides, and constraints <br />that cannot be removed; construction measures for backfill, <br />compaction, drainage, weather limitations, access across slope <br />easements; inspection requirements during and following <br />construction; and graphical representation of slope easements and <br />design details for foundations and structures. <br />Comments: <br />Hazardous Materials Review <br />Yes No <br />Planned Unit Development Completeness Review Form Revised 6/2015 Page 2 of 4 <br />