resource inventory shown. <br />❑ <br />0 <br />® <br />53. If disturbance to natural features, a mitigation plan was submitted, <br />in accordance with 9.8320(4)(c). <br />Comments' 1d <br />Architectural Features of Proposed Buildings <br />Submitted <br />Missing <br />Incomplete <br />N/A <br />® <br />❑ <br />❑ <br />❑ <br />54. Indicated general building locations, bulk and height. <br />® <br />❑ <br />❑ <br />❑ <br />55. Indicated key architectural features of proposed buildings (concept <br />drawings okay). <br />❑ <br />❑ <br />® <br />56. Indicated how buildings proposed on slopes will blend with natural <br />terrain if subject to the South Hills Study. <br />.Comments <br />Supporting Documents <br />Submitted <br />Missing <br />Incomplete <br />N/A <br />57. Submitted a legal description of the property included in the <br />® <br />❑ <br />❑ <br />❑ <br />planned unit development application. This legal description is <br />" <br />" <br />white sheet of paper (no letterhead) so that <br />typed on an 8% <br />x 11 <br />it is suitable for recording <br />® <br />❑ <br />❑ <br />❑ <br />58. Submitted a preliminary title report. <br />59. If application requires notification to Oregon Division of State Lands <br />concerning potential wetland permit requirements (on Eugene LWI <br />® <br />❑ <br />❑ <br />® <br />or WEWP Inventory Maps), notification form and related map is <br />prepared and attached (by staff). (ORS 215.418) <br />*Planner: for necessary forms, Click here. <br />® <br />❑ <br />❑ <br />❑ <br />60. Submitted a Geotechnical Analysis <br />Comments <br />For Staff Use Only - Referral Information <br />Yes <br />No <br /> <br />❑ <br />1. Route'land use referral to PW stafffor'Privately Engineering Public Improvement (PEP[). <br />® <br />❑ <br />2. Route land use referral to Public Works Maintenance. <br />❑ <br />3. Is the right-of-way county maintained? If yes, route land use referral to Lane County <br />Transportation and Lane County Road Maintenance Planning. <br />❑ <br />® <br />4, Route to Bonneville Power Administration (if site includes a BPA easement) <br />5. Other. <br />Tentative Planned Unit Development Completeness Review Form Page 4 o'14 <br />