My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental Materials
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Supplemental Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:40:29 AM
Creation date
7/6/2018 10:55:36 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Supplemental Materials
Document_Date
6/22/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIVERSITY OF OREGON <br />NORTH CAMPUS <br />CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION <br />direction of flow of all water courses and the base flood elevation, and reviewed by <br />the city through the standard development process as they become available. <br />.13 Public Access -- Circulation <br />Item 1: Details will be provided on individual projects regarding traffic circulation and <br />width of travel lanes, and will be reviewed by the city through the standard <br />development process as they become available. <br />Item 2: Details will be provided on individual projects regarding location and dimension <br />of existing and proposed curb cuts, and will be reviewed by the city through the <br />standard development process as they become available. <br />Item 3: Existing and proposed pedestrian walkways and bicycle paths (including <br />dimensions) and how they connect with adjacent properties are shown on Sheet <br />L03 Pedestrian and Bicycle Primary Circulation Plan. <br />Item 4: Details will be provided on individual projects regarding location and dimension <br />of public sidewalks, and will be reviewed by the city through the standard <br />development process as they become available. <br />Item 5: Existing and proposed public access connections to, and along, the Willamette <br />River are shown on Sheet L02 Site Plan (Exhibit A). <br />.14 Supporting Analysis and Documents <br /> <br />Item 1: A Geotechnical Analysis will be provided on individual projects and reviewed by <br />the city through the standard development process as they become available. <br />Item 2: A wetland determination from the ODSL and wetland delineation report will be <br />provided on individual projects and reviewed by the city through the standard <br />development process as they become available. <br />Item 3: A legal description of the property included in this application is provided in <br />Exhibit F. The legal description is typed on an 8" x 11" white sheet of paper so <br />that it is suitable for recording. <br /> <br />Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 51 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.