My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental Materials
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Supplemental Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:40:29 AM
Creation date
7/6/2018 10:55:36 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Supplemental Materials
Document_Date
6/22/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIVERSITY OF OREGON <br />NORTH CAMPUS <br />CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION <br /> <br />.11 Contour Intervals <br />Item 1: One-foot contour intervals for ground slopes up to five percent will be provided on <br />individual projects and reviewed by the city through the standard development <br />process as they become available. <br />Item 2: Two-foot contour intervals for ground slopes between five and ten percent will be <br />provided on individual projects and reviewed by the city through the standard <br />development process as they become available. <br />Item 3: Five-foot contour intervals for ground slopes exceeding ten percent will be provided <br />on individual projects and reviewed by the city through the standard development <br />process as they become available. <br />Item 4: Bench marks used will be provided on individual projects and reviewed by the city <br />through the standard development process as they become available. <br />Item 5: Existing vegetation to be preserved shall be shown on contour map and will be <br />provided on individual projects and reviewed by the city through the standard <br />development process as they become available. <br />.12 Storm Drainage Requirements <br />Item 1: Details will be provided on individual projects regarding location and flow line <br />elevation of the existing piped public system at proposed connection point(s) and <br />reviewed by the city through the standard development process as they become <br />available. <br />Item 2: Details will be provided on individual projects regarding existing and proposed <br />storm drainage, including disposition of stormwater for all lots and reviewed by the <br />city through the standard development process as they become available. <br />Item 3: Details will be provided on individual projects regarding a description of the <br />extent to which a watercourse will be altered or relocated as a result of proposed <br />development, including a stormwater analysis of pre- and post-development <br />flows, and reviewed by the city through the standard development process as <br />they become available. <br />Item 4: Bench mark used will be provided on individual projects and reviewed by the city <br />through the standard development process as they become available. <br />Item 5: A stormwater analysis (3 copies) will be provided on individual projects regarding <br />any contributing stormwater runoff to a drainage-way that addresses the <br />capacity and any erosion issues of the downstream system, and reviewed by the <br />city through the standard development process as they become available. <br />Item 6: Details will be provided on individual projects regarding areas subject to Federal <br />Emergency Management Agency (FEMA) regulations regarding inundations or <br />stormwater overflow, all areas covered by water, and the location, width, and <br />Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 50 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.